Trade Journal

Fordyce Construction, Inc.

is seeking certified and qualified HUD Section 3 subcontractors and/or suppliers to provide AC Paving, Concrete, Earthwork, Electrical, Fencing, Fire Sprinklers, Interior Signage, Painting, Pavement Markings, Signs, Structural Steel, Survey, Underground Utilities


PROJECT NAME:

Public Facility Improvement Project and Faivre Street & Broadway Sidewalk Improvement Project

BID CONTRACT #:

GGV0254 & GGV0255

AWARDING AGENCY:

City of Chula Vista

PROJECT LOCATION:

205 27th Street, Chula Vista, CA, 91911

BID DUE DATE:

05-18-2022 at 02:00 PM

OUTREACH COORDINATOR:

Blythe Campbell

TELEPHONE:

(619) 449-4272

FAX:

(619) 449-1930

ADDRESS:

9932 Prospect Avenue, Suite 138, Santee, CA, 92071

PROJECT DETAILS:

SCOPE: The Public Facility Improvement Project includes clearing and grubbing, grading, PCC gravity walls, drainage, utilities, building foundations and anchorages, site paving, on-site pedestrian improvements, site lighting, preparing the project site for the installation and/or construction of premanufactured dwelling structures (Pallet Shelters) and modular shower and bathroom facilities (CRATE Modular, Inc.), setting and aligning Pallet Shelters on Contractor constructed foundations and anchoring the shelters to the foundations with Contractor fabricated and installed anchors, construction of a covered trash enclosure, and installation of mechanical, electrical, plumbing, fire sprinkler, and fire alarm systems. The scope of this project also includes traffic control, protection, and restoration of existing improvements, removal, and restoration of existing improvements. All labor, material, equipment, and transportation necessary for the project shall be included for all construction bid items listed for this project.

The Faivre Street & Broadway Sidewalk Improvement Project includes the installation of curb, gutter, sidewalk, curb ramps, street light, driveway, sewer lateral, storm drain pipe. The scope of this project also includes traffic control, protection and restoration of existing improvements, other miscellaneous work, and all labor, material, equipment, and transportation necessary for the project. The water main extension, domestic water service, domestic water meter, and fireline water service inside the Right-of-Way and shown on Project Drawing No. 20026-3 has already been installed by Sweetwater Authority and is not a part of this contract.

We are an Equal Opportunity Employer and intend to seriously negotiate with certified and qualified DVBE,DBE,MBE,WBE,SBE
subcontractors and/or suppliers for project participation.

Plans & Specifications are available for viewing on our website under Bidding Projects and at our office for no cost.

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All
subcontractors/vendors awarded work on this project must be prepared to furnish subcontract performance and payment bonds, for
the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company.

We will require that all participating companies carry Workers' Compensation & Liability Insurance and be bonded. If you are in need of assistance regarding bonding, insurance or credit lines, please contact Blythe at 619.449.4272 so we may assist you.

Assistance is available to interested subcontractors in obtaining necessary equipment, supplies or materials, please contact Blythe at 619.449.4272. 

If you have any questions please do not hesitate to contact us.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.