Conan Construction, Inc.

is seeking certified and qualified City of San Diego SLBE/ELBE subcontractors and/or suppliers to provide Demolition, metal fabrication, structural steel, pipe and tube railings, architectural wood casework, wood paneling, penetration fire stopping, joint sealants, hollow metal frames, flush wood doors, door hardware, floor prep, drywall, ceramic tile, resilient flooring, sheet carpet, interior paint, signage, toilet, bath, and laundry accessories, theatrical platform, stage platform and flooring, theatrical riggs, systems and control, theatrical lighting dimming and control, theatrical lighting fixtures, theatrical audio video system, plumbing, hvac, electrical, fixed seating, portable seating.


PROJECT NAME:

Lyceum Theatre Renovation

BID CONTRACT #:

22027

AWARDING AGENCY:

Civic San Diego

PROJECT LOCATION:

79 Horton Plaza, San Diego, CA, 92101

BID DUE DATE:

05-23-2022 at 03:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

7605121188

FAX:

NA

ADDRESS:

5937 Darwin Court, Suite 103, Carlsbad, CA, 92008

PROJECT DETAILS:

You're Invited to Bid Lyceum Theater Renovation.


Project Requirements: SLBE & ELBE Subcontractors and Suppliers are encouraged to bid.

All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time.  Prevailing Wage Project. 

PROJECT DESCRIPTION:

The work generally consists of renovation of two theatre spaces located within the Lyceum Theatre: the 'Main Stage' and the 'Black Box' theatres. Audience areas within the Main Stage will receive new fixed theatre seating, flooring, fire protection modifications, new doors/hardware, and finishes. Within the Black Box new portable audience seating system will be installed. Stage area improvements common to both theatres will consist of upgraded theatrical rigging, and theatrical lighting and audio/visual equipment, as well as HVAC modifications to improve heating and cooling. The Main Stage will also receive a modular stage flooring system. Dressing room areas are currently included in the project as an additive alternate and will be incorporated into the Project, budget permitting. Dressing room areas would receive plumbing, electrical power, lighting, and HVAC modifications to accommodate the revisions to the floor plan. Structural modifications will be made throughout the theatre spaces to facilitate the above-mentioned improvements. Demolition of miscellaneous existing improvements throughout the space are required to make way for the new improvements.