Trade Journal

NAC Architecture

is seeking certified and qualified DBE, DVBE, LGBTBE, Los Angeles County LSBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Structural Engineer, Civil Engineer, Mechanical Engineer, Electrical Engineer, Plumbing Engineer, Cost Estimator, Landscape Architect, Acoustics Consultant, Technology Consultant, Historic Consultant, and Move Management Consultant


PROJECT NAME:

REQUEST FOR PROPOSALS DESIGN AND RELATED SERVICES FOR VARIOUS SEISMIC RETROFIT PROJECTS

BID CONTRACT #:

RFP NUMBER: BRC0000319

AWARDING AGENCY:

County of Los Angeles Department of Public Works

PROJECT LOCATION:

900 South Fremont Ave., Alhambra, CA, 91803

BID DUE DATE:

05-31-2022 at 04:00 PM

OUTREACH COORDINATOR:

SUZAN EDWARDS

TELEPHONE:

(323) 475-8075

FAX:

Not Available

ADDRESS:

837 N. Spring Street, 3rd Floor , Los Angeles, CA, 90012

PROJECT DETAILS:

NAC Architecture is seeking certified and qualified CBE, DVBE, DBE, WBE, MBE, SBE, and LGBTBE subs to provide various services (Structural Engineer, Civil Engineer, Mechanical Engineer, Electrical Engineer, Plumbing Engineer, Cost Estimator, Landscape Architect, Acoustics Consultant, Technology Consultant, Historic Consultant, and Move Management Consultant ) for the County of LA DPW REQUEST FOR PROPOSALS DESIGN AND RELATED SERVICES FOR VARIOUS SEISMIC RETROFIT PROJECTS RFP NUMBER: BRC0000319

There are a total of 29 County facilities that are anticipated for seismic retrofit over the next several years. The preliminary construction budget for all projects in total is $250 to $350 million, which is to be validated during the pre-construction phase. The term of the Consultant Services Agreement (Agreement) will be for three years. 

The seismic retrofit design will vary from facility to facility, and the assumption for all projects is that construction will likely be phased, and all buildings will remain occupied during construction. Areas of intense work may require some tenants to be relocated to other parts of the building or to an alternate building location.  The assumption is that all retrofitted facilities will meet the Basic Performance Objective for Existing Buildings (BPOE).

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.