Trade Journal

Kiewit Infrastructure West Co

is seeking certified and qualified ACDBE, DBE, DVBE, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Asphalt Paving • Acoustical Ceilings and Wall Panel • Aggregates • Architectural Woodwork • Auger Cast Piles • Bird Deterrent Devices • Building Furnishing • Building Insulation • Building Interior • Specialties Building Safety & Fire Protection • Cast-in-Place Concrete • Cathodic Protection • Cellular Concrete • Ceramic Tile • Concrete Formwork • Concrete Pumping • Concrete Supply • Crane & Hoists • Dewatering • Doors • Earthwork • Epoxy Injection System • Erosion Control • Expansion Joint • Fiberglass Reinforced Plastic • Fire Suppression • Flashing & Sheet Metal • Flooring • Framing & Gypsum Board Hatches • HVAC • Installation of Truck Scale • Joint Sealants • Masonry • Mechanical Equipment • Metal Roofing • Minor Concrete • Misc. Metals & Structural Steel • Overhead Coiling Doors • Painting & Coating • Pipe & Valve Supply • Potholing • Precast Concrete • Precast Utility Structures • Pre-Fabricated Metal Building & Canopy • Quality Control • Rebar • Shoring • Signage • Skylights • Steel Decking • Striping • Subsurface Utility Exploration/Engineering • Tanks (FRP) • Tanks (Vertical Post-Tensioned) • TPO Roofing • Traffic Control • Trucking • Waterproofing/Dampproofing • Windows & Glazing


PROJECT NAME:

SCWP - SECONDARY TREATMENT AND DEWATERING PROJECT

BID CONTRACT #:

UY-21-07

AWARDING AGENCY:

City of Sunnyvale

PROJECT LOCATION:

1444 Borregas Ave, Sunnyvale, CA, 94089

BID DUE DATE:

08-10-2022 at 03:00 PM

OUTREACH COORDINATOR:

Amanda Schroeder

TELEPHONE:

7074397300

FAX:

7074397301

ADDRESS:

4650 Business Center Drive, Fairfield , CA, 94534

PROJECT DETAILS:

The Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the “Secondary Treatment and Dewatering Project, Project No.UY-21-07". The Work includes but is not limited to: site work, new building construction, installation of major process equipment, yard piping within the Water Pollution Control Plant boundaries, existing facility modification/demolition, electrical/instrumentation/control system improvements, and related systems and facilities.

This project will be funded by the State Water Resources Control Board’s Clean Water State Revolving Fund (SRF) program and is subject to the requirements of the SRF program.  In addition Bidder must comply with requirement of WATER INFRASTRUCTURE FINANCE AND INNOVATION ACT CONDITIONS .Therefore the contractors and all subcontractors shall comply with the conditions and requirements of the above acts.

  • Federal Labor Standards Provision
  • American Iron and Steel Provisions
  • Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE)
  • Participation and Obligation
  • Debarment and Suspension (Executive Order 12549)
  • Equal Employment Opportunity (Executive Order 1246)

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.