Trade Journal

Erickson-Hall Construction Co

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE MAGNOLIA HIGH SCHOOL POOL RENOVATION. The scope includes the renovation and modification to the existing pool facility, including but not limited to pool structural modification, new pool equipment, site demolition, select interior demolition, minor grading, storm drain, deck drainage, shade structures, furnishings, bleachers, scoreboard, fencing, site concrete, structural concrete, masonry, structural steel, metal deck, sheet metal, roofing, D/F/H, framing, drywall, ceramic tile, restroom accessories, pool equipment, plumbing, electrical, low voltage. Job Walk - 06/09/22 - 10am @ main parking lot. Budget $4,000,000.00 All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall (760) 769-7700 - Prequalification Due 06/09/22


PROJECT NAME:

Magnolia HS Pool Renovation

BID CONTRACT #:

04-120892

AWARDING AGENCY:

Erickson-Hall Construction CO.

PROJECT LOCATION:

2450 W. Ball Road, Anaheim, CA, 92804

BID DUE DATE:

06-28-2022 at 02:00 PM

OUTREACH COORDINATOR:

Laura Cullifer

TELEPHONE:

7607967700

FAX:

7607967750

ADDRESS:

500 Corporate Drive, Escondido, CA, 92029

PROJECT DETAILS:

ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE MAGNOLIA HIGH SCHOOL POOL RENOVATION. The scope includes the renovation and modification to the existing pool facility, including but not limited to pool structural modification, new pool equipment, site demolition, select interior demolition, minor grading,  storm drain, deck drainage, shade structures, furnishings, bleachers, scoreboard, fencing, site concrete,  structural concrete, masonry, structural steel, metal deck, sheet metal, roofing, D/F/H, framing, drywall, ceramic tile, restroom accessories, pool equipment, plumbing, electrical, low voltage. Job Walk - 06/09/22 - 10am @ main parking lot. Budget $4,000,000.00 All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall  (760) 769-7700 - Prequalification Due 06/09/22 

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.