Trade Journal

S+B James Construction

is seeking certified and qualified DBE, DVBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Selective Demolition / Abatement, Concrete, Structural Steel, Building Insulation, Roofing, Plaster, Drywall / Framing, Plumbing, HVAC, and Electrical


PROJECT NAME:

Sacramento City USD - Rosa Park MS & Leonardo Davinci MS

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Not Available

PROJECT LOCATION:

2250 68th Avenue, Sacramento, CA, 95822

BID DUE DATE:

08-10-2022 at 05:00 PM

OUTREACH COORDINATOR:

Austin James

TELEPHONE:

9167656750

FAX:

Not Available

ADDRESS:

1450 Halyard Dr Suite 1, WEST SACRAMENTO, CA, 95691

PROJECT DETAILS:

Number: S22-5589

Bids Due: Aug 10, 2022 at 5:00 PM PDT

Location: 2250 68th Avenue, Sacramento, CA 95822, United States of America

Job Walk: Jul 29, 2022 at 12:00 PM PDT

Pre-Bid RFIs Due: Aug 2, 2022 at 12:00 PM PDT

Expected Start: Jun 5, 2023

Expected Finish: Aug 14, 2023

Architect: HMC Architects

Description: Lease-Lease-Back Construction Project for Sacramento City Unified School District. Project has a Project Labor Agreement and requires skilled and trained reporting and certified payroll.
 

Project is primarily focused on HVAC upgrades for an existing gymnasium building each at 2 different school sites.
 

Rosa Parks Middle School

2250 68th Avenue, Sacramento, CA 95822

Scope to Include but not limited to:

  • HVAC equipment removal and associated demo
  • Demo existing roof structure support and curbs associated with HVAC equipment upgrades and install new steel support systems
  • Demo existing gas lines and reinstall new gas line for new equipment
  • Install new condensates for new equipment
  • Demo existing electrical connections and reinstall to new equipment
  • Remove and replace fire alarm devices throughout building
  • Remove and patchback in kind existing finishes required to facilitate HVAC equipment work
  • Remove existing roofing and associated sheet metal down to bare structure and replace with new single ply roofing and new flashings

 

Leonardo Davinci Middle School

4701 Joaquin Way, Sacramento, CA 95822

Scope to Include but not limited to:

  • HVAC equipment removal and associated demo
  • Demo existing roof structure support and curbs associated with HVAC equipment upgrades and install new steel support systems
  • Demo existing gas lines and reinstall new gas line for new equipment
  • Install new condensates for new equipment
  • Demo existing electrical connections and reinstall to new equipment
  • Remove and replace fire alarm devices throughout building
  • Remove and patchback in kind existing finishes required to facilitate HVAC equipment work
  • Remove and patchback roofing in kind around modified openings for new equipment

 

Due to long lead procurement, bid packages will be broken out as follows:

A-TRADES

  • 07A Roofing
  • 22A Plumbing
  • 23A HVAC
  • 26A Electrical

B-TRADES

  • Remaining bid packages

 

Job Walks will be scheduled at each school site for sub viewing, research and investigation associated with this proposal as follows:

July 26 - 12pm @ Rosa Parks and 2 pm at Leonardo Davinci

July 29 - 12pm @ Rosa Parks and 2 pm at Leonardo Davinci

August 5 - 12pm @ Rosa Parks and 2 pm at Leonardo Davinci

 

Please contact us with any questions and please mark if you are confirmed to submit a proposal.

 

Thank you.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.