Trade Journal

Jilk Heavy Construction, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Lead Compliance Plan - Signs – Traffic Control – Pavement Marking – Remove Pavement Marking - Traffic Stripe – Channelizer – Radar Signs – K-Rail – Crash Cushion – SWPP Plan – Rain Event Plan – Storm Water Sampling - Storm Water Report – Street Sweeping – Thermoplastic Striping – Remove Striping – Treated Wood Waste Disposal – Irrigation System – Fiber Rolls – Hydroseed – Compost – Lean Concrete Base – AC Dike – Tack Coat – Asphalt Concrete Paving – Drilled Holes – Concrete Pile – Concrete Panel – Structural Shotcrete – Sign Structure – Remove Sign Structure – Clean & Pain Steel Pile – Stain Concrete – Rock Scaling – Chain Link Fence – Concrete Barrier – Remove Concrete Barrier – Remove Guardrail – Lighting Systems


PROJECT NAME:

07-342804 Construct Catchment Wall, Rock Scaling and Concrete Barrier - Santa Clarita

BID CONTRACT #:

07-342804

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Santa Clarita, CA, 91321

BID DUE DATE:

08-16-2022 at 02:00 PM

OUTREACH COORDINATOR:

Jeremiah Jilk

TELEPHONE:

310-830-6323

FAX:

310-835-2163

ADDRESS:

500 S. Kraemer Blvd Suite 380, Brea, CA, 92821

PROJECT DETAILS:

Jilk Heavy Construction intends to seriously consider all proposals for participation on this project.  Plans and specs for this project are available for viewing at JHC’s Home office and on the web at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php.  If applicable Jilk Heavy Construction, Inc. will provide assistance in obtaining lines of credit, insurance and/or bonding.  If applicable Jilk Heavy Construction, Inc. will provide assistance in obtaining the necessary equipment, supplies, materials, related assistance or services.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.