Trade Journal

Bosco Constructors, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Bosco Constructors, Inc seeks qualified subcontractors and suppliers including certified support re the following project elements, including but not limited to 1. Construct Outfall Structure Per Plan, Profile and Detail on Sheet C-6 and Structural Details, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 2. Construct 60” Tideflex TF-1 Duckbill Valves per Plan, Profile and Details on Sheet C-7 (Typical of 2), per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 3. Furnish and Install 36” RCP Lateral Per Plan and Profile, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 4. Construct R.C. Collar per Plan, Profile, OCPF&RD Standard Plan 380-4-OC, and Detail on Sheet C-7, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 5. Furnish and Install 18” RCP Lateral Per Plan and Profile, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 6. Construct Manhole Shaft per Plan, Profile and OCPF&RD Standard Plan 326-2-OC, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 7. Construct Storm Drain Manhole Frame and Cover per Plan and SPPWC Standard Plan 633-3, Per Lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 8. Construct FRP Ladder with Extension per Plan, and Details on Sheet C-8, Per Lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 9. Construct CMU Retaining Wall Per Plan, and SPPWC Standard Plan 618-3 Type B, Per Lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 10. Remove and Relocate Existing Signs at New Location per Plan, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 11. Install Cable Railing (Non-Corrosive Material) above Outfall Structure per Plan, and Detail on Sheet C-7, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 12. Remove Interfering Portions of Existing Headwall per Plan, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 13. Remove Existing 84” SD & 36” SD, Remove Existing Manhole, Access Hatch, and Appurtenances, Remove Existing Mini-Module Stone Retaining wall, per Plan, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 14. Remove & Relocate Existing Utility Box and Electrical Box per Plan on Sheet C-5, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 15. Remove Existing Block Wall & Footing, Interfering Portions of Existing Concrete, Interfering Portions of Existing Curb, and AC Pavement, per lump Sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 16. Remove & Relocate Existing Irrigation Valve and Valve Box, per lump Sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 17. Landscaping, per lump Sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 18. Temporary Construction Dewatering (Groundwater) and Temporary Diversion of Storm Drain Flows During Construction, per Lump Sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 19. Mobilization not to exceed 5%, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ____________________________ 1 LS $__________ 20. Traffic Control not to exceed 15%, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: _______________ 1 LS $__________ 21. Stormwater Best Management Practices, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 22. Construction Water, per lump sum Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ 1 LS $__________ 23. Allowance for Field Orders Unit Price in Figures: $____________________________ Unit Price in Words: ______________________________ Fixed Price $100,000


PROJECT NAME:

BLUEBIRD STORM DRAIN OUTFALL AND DIVERSION STRUCTURE REHABILITATION PROJECT

BID CONTRACT #:

CIP 16-100

AWARDING AGENCY:

City of Laguna Beach

PROJECT LOCATION:

Laguna Beach, CA, 92652

BID DUE DATE:

08-10-2022 at 02:00 PM

OUTREACH COORDINATOR:

Claudia Morón

TELEPHONE:

(818) 700-0304

FAX:

8182803444

ADDRESS:

21353 Mayall St. Chatsworth, Chatsworth, CA, 91311

PROJECT DETAILS:

Please call me at the Office number listed above or email me if you have any questions about the project. EMAIL ME FOR PLANS AND SPECS Thank You. Plans, specifications and addenda (if any) are available via drop box link/s if need, please forward request/s to csm.bosco@gmail.com, Bosco Constructors Inc. is an equal opportunity employer. Bosco Constructors Inc. will provide assistance including but not limited to obtaining bonding, lines of credit, insurance, necessary equipment, supplies and/or materials upon request. Please ensure all communications contain an existing/ active license, DIR Registration, along with related certifications if any.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.