Kiewit Infrastructure West Co

is seeking certified and qualified ACDBE, DBE, DVBE, HUD Section 3, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide •AC Paving •Aggregates •Cast-In-Place Concrete •Cathodic Protection •Concrete Pumping •Concrete Repair •Concrete Supply •Cranes and Hoists •Demolition •Dewatering •Doors, Windows & Glazing •Drilled Concrete Piers •Dump Fees •Electrical •Electrical Supply •Electrical Testing •Fences & Gates •Fire Alarm •Hazardous Waste Removal •HVAC •Joint Sealants •Keystone Wall •Louvers •Mechanical Equipment •Minor Concrete •Misc Metals & Structural Steel •Painting and Coating •Piling •Piping and Valves •Potholing/Vacuum Truck •Pre-Engineered Buildings •Precast Utility Structures •Quality Control •Rebar •Sawcutting/Core Drill •Shoring •Signage •Slide Gates and Stop Logs •Sound-Absorptive Panels •Storefronts •Striping / Pavement Markings •Survey •Sweeper Truck •SWPPP •Temporary Bypass Pumping •Trucking & Hauling •Water Truck


PROJECT NAME:

Secondary Treatment Upgrades (STU) Project

BID CONTRACT #:

185822

AWARDING AGENCY:

City of Palo Alto

PROJECT LOCATION:

2501 Embarcadero Way, Palo Alto, CA, 94303

BID DUE DATE:

10-06-2022 at 03:00 PM

OUTREACH COORDINATOR:

Amanda Schroeder

TELEPHONE:

7074397300

FAX:

7074397301

ADDRESS:

4650 Business Center Drive, Fairfield , CA, 94534

PROJECT DETAILS:

The Work to be performed under this contract includes but is not limited to:

  • Intermediate Lift Station (ILS): Modification and upgrade of ILS, including structural, mechanical, electrical, and instrumentation and control systems.
  • Aeration Tanks: Modification and upgrade of Aeration Tanks 1-4, including structural, mechanical, electrical, and instrumentation and control systems. Modification and upgrade of Aeration Tank Effluent Structure, including structural, mechanical, electrical, and instrumentation and control systems.
  • Aeration Blowers: Upgrade and modification of aeration blower systems, including architectural, structural, mechanical, electrical, and instrumentation and control systems.
  • RAS Pumping Station 1: Addition of RAS Pumping Station 1, including structural, mechanical, electrical,
  • and instrumentation and control systems. Addition of RAS distribution station and sodium hypchlorite system.
  • RAS Pumping Station 2: Modification and upgrade of RAS Pumping Station 2, including structural, mechanical, electrical, and instrumentation and control systems.
  • WAS Pumping System: Upgrade and modification of WAS Pumping System, including structural, mechanical, electrical, and instrumentation and control systems.
  • Mixing Air Compressor System: Addition of Mixing Air Compressor System, including structural, mechanical, electrical, and instrumentation and control systems.
  • Electrical Systems: Upgrades to power distribution systems, including addition of Load Center  11, replacement of an existing standby generator, motor control centers, power distribution panels and equipment, lighting, and all related ancillary components and systems.
  • Instrumentation and control systems: Provision of instrumentation and control systems, including but not limited to control system network upgrades and control panels.
  • Site work including: Yard piping, electrical, and control systems. Elevated pipe racks. Paving and grading. Other site improvements
  • Demolition of existing facilities
  • Decommissioning of existing fixed film reactors
  • Sequencing of the work and provision of temporary support facilities and systems as required to complete the Work, including but not limited to temporary standby power systems, temporary bypass pumping systems, temporary flow control systems such as bulkheads and barriers, temporary aeration blower systems, and all similar items necessary to complete the work.

This project will be funded by the State Water Resources Control Board’s Clean Water State Revolving Fund (SRF) program and is subject to the requirements of the SRF program.  In addition Bidder must comply with requirement of WATER INFRASTRUCTURE FINANCE AND INNOVATION ACT CONDITIONS .Therefore the contractors and all subcontractors shall comply with the conditions and requirements of the above acts.

  • Federal Labor Standards Provision
  • American Iron and Steel Provisions
  • Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE)
  • Participation and Obligation
  • Debarment and Suspension (Executive Order 12549)
  • Equal Employment Opportunity (Executive Order 1246)

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.