Trade Journal

Riverside Construction Company, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Temporary Crash Cushion, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Handling And Disposal Of Type Tph Soil, Treated Wood Waste, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Bonded Fiber Matrix (Sqft), Remove Asphalt Concrete Dike, Jointed Plain Concrete Pavement, 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Structural Concrete, Bar Reinforcing Steel, Furnish Sign Structure (Truss), Install Sign Structure (Truss), Remove Sign Structure (Ea), Roadway Excavation (Detention Basin), 8" Plastic Pipe (Schedule 40) (Supply Line) (Detention Basin), Class 2 Aggregate Base (Detention Basin), Minor Concrete (Minor Structure) (Detention Basin), 24" Reinforced Concrete Pipe (Detention Basin), 24" Corrugated Steel Pipe (0.109" Thick) (Detention Basin), 48" Corrugated Steel Pipe Riser (0.109" Thick) (Detention Basin), 24" Concrete Flared End Section (Detention Basin), Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy) (Detention Basin), Rock Slope Protection Fabric (Class 8) (Detention Basin), Miscellaneous Metal (Detention Basin), Maintenance Drain Valve (Detention Basin), Geomembrane (Water Barrier), Remove Culvert (Lf), Chain Link Fence (Type Cl-6), 10' Chain Link Gate (Type Cl-6), Remove Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker, Remove Marker, Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Furnish Laminated Panel Sign (1"-Type A), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign Panel On Existing Post, Concrete Barrier (Type 60Ms), Concrete Barrier (Type 836B), Remove Single Metal Beam Barrier, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Modifying Lighting Systems, Mobilization.


PROJECT NAME:

Construct New Detention Basin

BID CONTRACT #:

12-0Q2704

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Route 57, Brea, CA,

BID DUE DATE:

10-04-2022 at 02:00 PM

OUTREACH COORDINATOR:

Alyssa Helm

TELEPHONE:

951-682-8308

FAX:

951-682-8350

ADDRESS:

4225 Garner Rd, Riverside, CA, 92501

PROJECT DETAILS:

Riverside Construction Company, Inc. is an equal opportunity employer and is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. 100% Performance and Payment bonds required. Subcontractor’s must possess a current contractor’s license. Please contact us for details. Please call if you need assistance in obtaining: bonding, insurance, equipment, materials, and/or supplies. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work. Plans & Specifications are available for viewing at our office or obtained from the Owner or portions may be emailed upon request. We intend to seriously negotiate with qualified firms for project participation. Please call if aid is needed in obtaining bonding, lines of credit, insurance, equipment, materials, supplies, plans or related technical assistance.

All docs are available on our website at bids.rivconstruct.com

DBE Goal: 21% - see specifications for more details.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.