Trade Journal

American River Construction, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Selective Demolition, Miscellaneous Concrete, Rough and Finish Carpentry, Composite Panels, Sheet Metal Flashing and Trim, Joint Sealants, Waterproofing Patch, Patch Flooring and Base, Hollow Metal Doors and Frames, Door Hardware, Architectural Louvers, Tinted Window Film, Cement Plaster, Acoustical Ceiling Modification, Gypsum Board, Exterior and Interior Painting, Basic Plumbing Materials and Methods, Plumbing Piping Systems, Basic HVAC Materials and Methods, HVAC Testing and Balancing, T-24 Commissioning of HVAC, Energy Management Systems Control System, HVAC, Electrical


PROJECT NAME:

HVAC Replacement at North County Elementary School ("NCES") and HVAC Replacement at Center High School ("CHS")

BID CONTRACT #:

Bid No. 22-02

AWARDING AGENCY:

Center Joint Unified School District

PROJECT LOCATION:

NCES, 3901 Little Road Drive; CHS, 3111 Center Court Ln, Antelope, CA, 95843

BID DUE DATE:

09-29-2022 at 02:00 PM

OUTREACH COORDINATOR:

Melissa Walker

TELEPHONE:

5306211785

FAX:

5306210360

ADDRESS:

5465 Merchant Circle, Suite #1 , Placerville, CA, 95667

PROJECT DETAILS:

The scope of work for this project includes, but is not limited to, the following:

At North County Elementary: Replacement of HVAC System at Buildings A, B, C, D/E, F, G/H, & I.

At Center High School: Replacement of HVAC System at Building G.

NOTE: This project is to be done during Fall Break and then on weekends &/or swing shift hours until complete.  Project must also be phased to accommodate equipment lead times.

Here is a Dropbox link to the project plans and specs: 

https://www.dropbox.com/sh/sdu5iqtyoshf3f6/AADfCLTu5HdcrPyDbGNLhf1_a?dl=0

Thank you,

American River Construction, Inc.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.