ProWest Constructors

is seeking certified and qualified DVBE and San Bernardino County subcontractors and/or suppliers to provide Final Clean Survey SWPPP Pest Control DIVISON 02 Site Demolition DIVISION 03 Cast In Place Concrete VETM Polished Concrete DIVISION 04 Thin Brick Veneer DIVISION 05 Structural Steel Metal Decking Misc. Metals Railings DIVISION 06 Cabinets & Finish Carpentry Plastic Paneling DIVISION 07 Waterproofing / Membrane Insulation Air Barriers Water Repellents Flashing & Sheet Metal Roof Accessories Joint Sealants PVC Roofing Metal Wall Panels DIVISION 08 Hollow Metal Doors & Frames Glass & Aluminum Overhead Coiling Door Door Hardware Louvers & Vents DIVISION 09 FRP Panels Flooring Acoustical Wall Panels Drywall & Metal Stud Framing Painting Acoustical Ceilings Lath & Plaster Ceramic Tile Vinyl Writing Surfaces Tackable Wall Surfaces Rigid Protective Wall Covering Sound Absorbing Wall Units DIVISION 10 Signage Fire Extinguishers & Cabinets Visual Display Units Toilet & Bath Accessories Toilet Compartments Operable Panel Partition DIVISION 12 Window Coverings DIVISION 21 Automatic Fire Sprinkler Protection DIVISION 22 Plumbing DIVISION 23 HVAC & Controls DIVISION 26 Electrical DIVISION 27 Integrated Audiovisual Systems Communications Systems & Clock Network Voice data Infrastructure DIVISION 28 Fire Alarm System Access Control Security System DIVISION 31 Earthwork DIVISION 32 Concrete Paving Asphalt Paving / Striping Decorative Metal Fences & Gates Tactile Warning Surfaces Landscape & Irrigation Site Furnishings


PROJECT NAME:

Desert Learning Academy 500 Building Rebuild - Increment 02

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Palm Springs Unified School District

PROJECT LOCATION:

2248 Ramon Road, Palm springs, CA, 92262

BID DUE DATE:

10-04-2022 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:  

                                                    ¨ This project includes construction of a new single story 9,956 SF Type -llB, steel moment framed structure. On the Desert Learning Academy campus. The structure is designed to accommodate general instruction, a lab, an e-sports instruction space, teachers professional development area, and a small assembly space. The project is fully sprinklered with thin Brick, Stucco Exterior, Phenolic Wall Panels, PVC Roof, site gates/fencing, landscape improvements, fire lane, shade trellis, and associated site utilities. Also included is small interior modernization of adjacent Buildings 300 & 400 to add restrooms and a small suite of offices.

                                                 

                                                  ¨ Estimated Cost: $15M

                                                  ¨ Project Duration: 365 Calendar Days

                                                 

                                                  ¨ A First Tier Sub- Contractor that intends to bid Electrical, Mechanical, Plumbing or Structural Steel components of this project through a Prime Contractor must submit a Prequalification Application by 9/16/22. For purposes of this prequalification Electrical, Mechanical, Plumbing or Structural Steel contractors holding the following license classifications C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46 or C-51 license. Bids will NOT be accepted if sub-contractor has not been prequalified by the district. Contractors will be notified by email their prequalification rating after submission of their prequalification documents, but not less than 5 days prior to the bid opening date. 

                                                 

                                                  The Prequalification Electronic process is coordinated through Colbi Technologies. Prequalification questionnaire and document submission instructions may be found at the following website: www.qualitybidders.com

                                              

                                       

    ¨Prevailing Wage Project

    ¨All subcontractors will be required to bond over $150,000 (Submit    bond rate with bid)

    ¨DVBE participation of Good Faith Effort has been established for this project.

    ¨Liquidated Damages $5,000 per calendar day.

    ¨Fingerprinting, background checks and badging will be required for all Subcontractors.

 

 

 

 

ON-LINE VIEWING 

 

BID MAIL (Please respond accordingly, as to bidding or not bidding so we can keep our records accurate)         

 

 

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.