Trade Journal

Hat Creek Construction & Materials, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide 1 Construction Surveying LS 1 2 Construction Area Signs LS 1 3 Traffic Control System LS 1 4 Job Site Management LS 1 5 Prepare Water Pollution Control Program LS 1 6 Temporary Fiber Roll LF 1,350 7 Contractor Supplied Biologist LS 1 8 Temporary High-Visibility Fence (Type ESA) LF 160 9 Clearing and Grubbing LS 1 10 Roadway Excavation CY 410 11 F Structure Excavation (Bridge) CY 22 12 F Structure Excavation (Type D) CY 232 13 F Structure Backfill (Bridge) CY 78 14 Imported Borrow CY 325 15 Embankment CY 735 16 Hydroseed SQFT 6,000 17 Class 2 Aggregate Base CY 265 18 Hot Mix Asphalt (Type A) TON 175 19 P Prestressing Cast-In-Place Concrete LS 1 20 F Structural Concrete, Bridge Footing CY 34 21 F Structural Concrete, Bridge CY 196 22 Joint Seal (Type B, MR 1”) LF 51 23 P-F Bar Reinforcing Steel (Bridge) LB 14,123 24 P-F Bar Reinforcing Steel (Epoxy Coated - Bridge) LB 12,242 25 Bridge Removal LS 1 26 Rock Slope Protection (1/2 Ton, Class VII,Method B) CY 195 27 P Rock Slope Protection Fabric (Class 8) SQYD 255 28 Obliterate Surfacing SQYD 900 29 Snow Pole Marker EA 8 30 Object Marker (Type P) EA 4 31 Reset Roadside Sign (One Post) EA 1 32 P Transition Railing (Type WB-31) EA 4 33 Terminal System MSKT-SP-MGS (TL2) EA 4 34 P-F California ST-75 Bridge Rail LF 185 35 Paint Pavement Marking (2-Coat) SQFT 39 36 Mobilization LS 1


PROJECT NAME:

Salmon Lake Road Bridge Replacement Over Church Creek

BID CONTRACT #:

BRLO-5913(059)

AWARDING AGENCY:

County of Sierra Department of Public Works

PROJECT LOCATION:

9 Mile NE of Sierra City, Sierra City, CA, 96125

BID DUE DATE:

09-27-2022 at 03:00 PM

OUTREACH COORDINATOR:

Gilberto Aceves

TELEPHONE:

530-335-5501

FAX:

530-335-5510

ADDRESS:

24339 State Highway 89 North , Burney, CA, 96013

PROJECT DETAILS:

Hat Creek Construction is an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through dropbox link below:

 

https://1drv.ms/u/s!ApcobrwtX5MTiXv2r8OWZvNQb8sB?e=NcsI7a


Hat Creek Construction will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our link above. Assistance is also available in obtaining bonds, lines of credit, insurance or other technical information.

Subcontractors will be required to enter into our standard contract. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.