Trade Journal

NV5, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Survey, Cost Estimating, Construction Scheduling, Project Controls


PROJECT NAME:

OWNER CONSULTANT REGARDING THE PROGRESSIVE DESIGN-BUILD OF THE OCEANSIDE MESA GARRISON FORCE MAIN, EL CORAZON LIFT STATION, MISSION AVE LIFT STATION FORCE MAIN REPLACEMENT, AND LAND OUTFALL REPLACEMENT

BID CONTRACT #:

Not Available

AWARDING AGENCY:

City of Oceanside

PROJECT LOCATION:

Oceanside, CA, 92054

BID DUE DATE:

11-04-2022 at 04:00 PM

OUTREACH COORDINATOR:

Marylou Flanders

TELEPHONE:

Not Available

FAX:

Not Available

ADDRESS:

15092 Avenue of Science, Suite 200, San Diego, CA, 92128

PROJECT DETAILS:

NV5, Inc. is in the process of preparing a proposal for the City of Oceanside:

REQUEST FOR PROPOSALS FOR OWNER CONSULTANT REGARDING THE PROGRESSIVE DESIGN-BUILD OF THE OCEANSIDE MESA GARRISON FORCE MAIN, EL CORAZON LIFT STATION, MISSION AVENUE LIFT STATION FORCE MAIN REPLACEMENT, AND LAND OUTFALL REPLACEMENT

We are seeking certified disadvantaged business enterprise (DBE) firms interested in performing the following types of work on this project: SURVEY, COST ESTIMATING, CONSTRUCTION SCHEDULING, AND PROJECT CONTROLS.


Brief Project Description:
A. The City of Oceanside (CITY) invites qualified entities to submit proposals for the role of Owner Consultant (OC) to assist CITY in the execution of the Progressive Design-Build (PDB) Project of the Oceanside Mesa Garrison (OMG) Force Main (OMG FM), El Corazon Sewer Lift Station (ECLS), Replacement of the Mission Ave Lift Station (MALS) Force Main (MALS FM), and Replacement of the Land Outfall (OLO).
B. All of the facilities mentioned above shall be referred to as the Project.
C. The CITY's long-term goal is to decommission the La Salina Wastewater Treatment Plant (LSWWTP) and redirect sewer flows to the San Luis Rey Water Reclamation Facility (SLRWRF).
D. The method of project execution is the Progressive Design-Build (PDB) project delivery method.
E. The CITY is currently in the process of procuring the Progressive Design-Build Team (PDBT) for the design and construction of the Project.

Additional information on the subject RFP can be obtained on the City of Oceanside website at https://www.ebidboard.com/public/rfps/showrfp.asp?mbrguid=CD8E6065-FD73-44DC-BC9D-CB916727D896&projectguid={A84680A5-C1D5-4560-A9A8-990480A45B75}

For consideration, forward by email your firm and personnel qualifications, list of relevant projects, and copies of firm current DBE certification (per 49 CFR 26) no later than monday, march 28th to:

Marylou Flanders, NV5, Inc., marylou.flanders@nv5.com

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2022 Compliance News All rights reserved.