PROJECT DETAILS
Scope of work includes but is not limited to: provide all labor, equipment, tools, materials, utility services, and transportation to complete all of the following work.
Remove existing middle school kitchen with the following but not limited to:
New flooring, remove and replace sewer system and incorporate owner furnished grease interceptor, renovate dry storage room as a new cooler. Construct an exterior dry storage building. Revise existing AC driveway approach to accommodate larger truck access. Replace existing fire suppression system to a newer model and layout. Replace existing fiber reinforced panel with new on all kitchen walls. Provide new gas, electric, and water to kitchen equipment as required.
*Please note that there is a mandatory job walk on August 31, 2023, at 9:00 a.m. at Rincon Middle School, 925 Lehner Avenue, Escondido CA 92026. This job walk is mandatory for GC, not subcontractors.
**Bid submittals must be delivered to the Purchasing Department, located at 2310 Aldergrove Avenue, Escondido CA 92029. Please see attached Notice Inviting Bids.