Conan Construction, Inc.

is seeking certified and qualified DBE, DVBE, MBE, SBE and WBE subcontractors and/or suppliers to provide equipment moving, SWPPP, rough carpentry, waterproofing, insulation, doors, frames, hardware, coiling doors, sound control doors, signage, toilet compartments, toilet accessories, fire protection, fire extinguishers, gym dividers, window shades, site furnishings, demolition, structural and selective, asbestos, lead and PCB, steel framing, structural steel, steel decking metal fabrications, pipe and tube railings, ant graffiti coating, final cleaning, moisture vapor, ceramic ceiling, acoustical ceilings, resilient base, resilient flooring, resilient athletic flooring, carpet, exterior painting, interior painting, food service equipment, wheelchair lift, relocatable buildings, prefabricated ramps.


PROJECT NAME:

Albert Einstein Academies Charter Elementary School Phase 1 Whole Site Modernization (Lease-Leaseback)

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Erickson Hall Construction

PROJECT LOCATION:

3035 Ash Street, San Diego, CA, 92101

BID DUE DATE:

02-03-2022 at 02:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

Not Available

FAX:

NA

ADDRESS:

5937 Darwin Court, Suite 103, Carlsbad, CA, 92008

PROJECT DETAILS:

DVBE & EBE Subcontractors & Suppliers are encouraged to bid.

Goals for EBE and DVBE Participation: 50% EBE 6% DVBE

Project Stabilization Agreement (PSA)

All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time.  Prevailing Wage Project.

PROJECT DESCRIPTION:

Bid Packages:

  • 01 – General Construction
  • 02 – Demolition & Abatement
  • 05 – Structural & Miscellaneous Steel
  • 11 – Finishes
  • 19 – Portable Buildings

791 Days, Make Ready improvements to prepare the site to facilitate the construction of Building D and create a new space for Interim Housing; Site and Building Improvements – including the construction of a one-story mixed-occupancy structure housing Kindergarten Classrooms and a Multi-Purpose room (Building D); related site improvements; Interim Housing, under a separate DSA number, including relocation of 4 existing modular classroom units onsite to the central area of campus and a new leased restroom building.

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.