Trade Journal

Granite Construction Company

is seeking certified and qualified DBE and SBE subcontractors and/or suppliers to provide This is a project for the Santa Clara Valley Water District to rehabilitate flood basin gates, including structural excavation, concrete pile cap, concrete deck surface, polyester concrete overlay, concrete cast piling, hydroseeding, planting and irrigation, . Engineer’s Estimate: $2,900,000 Contract Time: 1,218 calendar days Granite Construction Company (Granite) is requesting quotes on this project from all qualified subcontractors and suppliers including certified SBE firms for any portion of the work, but specifically the following suggested items: Survey; Traffic Control; Environmental Compliance Measures; Noise/Vibration Monitoring; Quality Control Testing; Utility Relocation; Fencing and Gates; Concrete Pile Cap; Rebar; Drill & Bond Dowel; Concrete Deck Surface; Polyester Concrete Overlay; Concrete Cast Piling; Trash Rack; Hydroseeding; Planting & Irrigation; Flap Gates; Shoring; Hauling of construction materials and Hauling of export from the site. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate SBE participation on this project. All non-SBE subcontractors are also encouraged to utilize SBE suppliers for their work, where possible. If you have any technical project questions, please contact Granite's ESTIMATOR: Fred Ackerman – (408) 327-7053 – fred.ackerman@gcinc.com SEND QUOTES to: coastal.estimating@gcinc.com or fax (408) 327-7090 by or before 12:00 pm on bid day. Plans and Specifications can be downloaded from our Pipeline Suite planroom linked below: https://projects.pipelinesuite.com/ehPipelineSubs/dspOpenProject/projectID/329201 Granite intends to work cooperatively with all qualified SBE firms seeking work on this project. Granite is an equal opportunity employer.


PROJECT NAME:

Palo Alto Flood Basin Tide Gate Rehabilitation, Santa Clara County

BID CONTRACT #:

C0710

AWARDING AGENCY:

Santa Clara Valley Water District

PROJECT LOCATION:

Palo Alto Flood Basin near the end of Embarcadero Road, Palo Alto, CA, 94301

BID DUE DATE:

07-02-2025 at 02:00 PM

OUTREACH COORDINATOR:

Patricia Arnett

TELEPHONE:

831-763-6100

FAX:

831-761-1042

ADDRESS:

580 West Beach Street, Watsonville, CA, 95077

PROJECT DETAILS:

Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions.  

100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# 

 

Subcontractors must possess a current contractor’s license and current DIR number. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation

 



 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.