Trade Journal

Cen-Cal Construction

is seeking certified and qualified HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide COLD PLACE, PRROF ROLL SUBGRADE, TRUCKING, TYPE A HOT ASPHALT, CURB AND GUTTER, ADA CRUB RAMPS, SIDEWALK, MINOR CONCRETE, GUTTER, APRON, SAWCUTTING, LAYOUT, DEMO, ALLEY APPROACH, ADJUST SEWER MANHOLE, ADJUST WATER VALVE, ADJUST MONUMENTS, WHITE AND YELLOW THERMOPLASTIC PAVEMENT MARKINGS, CROSS WALK LINE, THERMOPLASTIC MARKINGS, SOLAR POWERED FLASHING LED STOP SIGN, SIGNAGE, BLUE FIRE HYDRANT MARKER, IRRIGATION SYSTEM INSTALL, RELOCATE IRRIGATION SYSTEM, EROSION CONRTOL PLAN, TRAFFIC CONTROL, WHITE RIGHT EDGE LINE, WHITE CHANNELIZING LINE, CONCRETE SUPPLIER, ASPHALT SUPPLIER, SOLAR SUPPLIER, TRAFFIC SIGN SUPPLIER


PROJECT NAME:

2025 Street Rehabilitation Various Locations

BID CONTRACT #:

B-24-CP-CA-0384

AWARDING AGENCY:

City of McFarland

PROJECT LOCATION:

Various Locations in McFarland, McFarland, CA, 93250

BID DUE DATE:

07-10-2025 at 02:00 PM

OUTREACH COORDINATOR:

Jason Plank

TELEPHONE:

661-399-3759

FAX:

661-399-3812

ADDRESS:

34762 Lencioni Avenue , Bakersfield, CA, 93308

PROJECT DETAILS:

A yellow and silver logo

Description automatically generated34762 LENCIONI AVENUE

BAKERSFIELD, CA 93308

OFFICE: (661) 399-3759

FAX: (661) 399-3812

 

 

 

 

Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified MBE, WBE, SBE and Section 3 Contractors or Suppliers. Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:

2025 Street Rehabilitation Various Locations 

To be located in the City of McFarland and funded in whole or part by Federal Funds.

Bid Date: July 10, 2025 @ 2:00 PM

Interested MBE, WBE, SBE and Section 3 firms may contact Jason Plank at (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on July 9, 2025.

* 07/09/2024- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid*


Bid documents can be obtained from:

City Consultant, BHT Engineering, Inc., 218 S. H Street, Suite 201, Bakersfield, CA 93304

Contact: Juan Pantoja, (661) 558-4641 or juan@bhtengineering.com

 

*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *

 

We are an equal opportunity employer and will consider all bids submitted.  Subcontractors are required to possess current contractors license as well as current Liability, Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage WBE, MBE, SBE and Section 3 Certified Contractors to contact Cen-Cal Construction to learn what assistance we can provide to you, such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.

Subcontractor and Supplier bids are required by 5:00 PM July 9, 2025.

 

Bids for the followings Items are being accepted:

 


 

Item 1-Cold Plane 3” of Existing Surface, Proof Roll Subgrade,      Haul-Off Excess Material

Item 2-Type A Hot Mix Asphalt 

Item 3-Install Curb & Gutter

Item 4- Install ADA Curb & Gutter

Item 5- Install Sidewalk

Item 6- Install 8” Thick Concrete X-Gutter/Apron/Alley Approach 

Item 7- Class 2 Aggregate Base

Item 8- Adjust Sewer Manhole to New Grades

Item 9- Adjust Water Valve to New Grades

Item 10- Adjust Monuments to New Grades

Item 11- Install White/Yellow Thermoplastic Pavement Markings 

Item 12- Install 12” Yellow/White Limit/Crosswalk Line-Thermo.

Item 13- Install 24” Yellow/White Crosswalk Line-Thermoplastic

Item 14- Furnish & Install Solar-Powered Flashing LED Stop Sign

Item 15- Furnish & Install R1-3P Sign 

Item 16- Salvage/Re-Install Existing Sign

Item 17- Furnish & Install R1-5 Sign

Item 18- Furnish & Install SW24-2(CA)-FYG Sign

Item 19- Install 6” Yellow Center Line (Detail 2) Thermoplastic 

Item 20- Install 6” Yellow Center Line (Detail 22) Thermoplastic 

Item 21- Furnish & Install Blue Fire Hydrant Marker

Item 22- Relocate/Adjust Irrigation System-In Kind

Item 23- Prepare & Implement Erosion Control Plan

Item 24- Temporary Traffic Control

Bid Option 1-Sherwood & Perkins Overpasses 

Item 25- Cold Plane 3” of Existing Surface, Proof Roll Subgrade, Haul-Off Excess Material

Item 26- Type A Hot Mix Asphalt

Item 27- Install Curb & Gutter

Item 28- Install ADA Curb & Gutter

Item 29- Install Sidewalk

Item 30- Install White Thermoplastic Pavement Markings 

Item 31- Install 12” Yellow/White Limit/Crosswalk Line-Thermo.

Item 32- Furnish & Install Solar-Powered Flashing LED Stop Sign

Item 33- Furnish & Install R1-3P Sign

Item 34- Salvage/Re-Install Existing Sign

Item 35- Install 6” Yellow Center Line (Detail 22) Thermoplastic

Item 36- Install 6” White Right Edge Line (Detail 27B) Thermoplastic

Item 37- Install 6” White Channelizing Line (Detail 38B) Thermo.

Item 38- Furnish & Install R3-7R “Right Lane Must Turn Right” Sign

Item 39-Temorary Traffic Control 

 

 

** Also requesting All Supplier Quotes**

** All Items can be broken down by supplier and install**


 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.