is seeking certified and qualified HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide COLD PLACE, PRROF ROLL SUBGRADE, TRUCKING, TYPE A HOT ASPHALT, CURB AND GUTTER, ADA CRUB RAMPS, SIDEWALK, MINOR CONCRETE, GUTTER, APRON, SAWCUTTING, LAYOUT, DEMO, ALLEY APPROACH, ADJUST SEWER MANHOLE, ADJUST WATER VALVE, ADJUST MONUMENTS, WHITE AND YELLOW THERMOPLASTIC PAVEMENT MARKINGS, CROSS WALK LINE, THERMOPLASTIC MARKINGS, SOLAR POWERED FLASHING LED STOP SIGN, SIGNAGE, BLUE FIRE HYDRANT MARKER, IRRIGATION SYSTEM INSTALL, RELOCATE IRRIGATION SYSTEM, EROSION CONRTOL PLAN, TRAFFIC CONTROL, WHITE RIGHT EDGE LINE, WHITE CHANNELIZING LINE, CONCRETE SUPPLIER, ASPHALT SUPPLIER, SOLAR SUPPLIER, TRAFFIC SIGN SUPPLIER
2025 Street Rehabilitation Various Locations
B-24-CP-CA-0384
City of McFarland
Various Locations in McFarland, McFarland, CA, 93250
07-10-2025 at 02:00 PM
Jason Plank
661-399-3759
661-399-3812
34762 Lencioni Avenue , Bakersfield, CA, 93308
PROJECT DETAILS:
34762 LENCIONI AVENUE
BAKERSFIELD, CA 93308
OFFICE: (661) 399-3759
FAX: (661) 399-3812
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified MBE, WBE, SBE and Section 3 Contractors or Suppliers. Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
2025 Street Rehabilitation Various Locations
To be located in the City of McFarland and funded in whole or part by Federal Funds.
Bid Date: July 10, 2025 @ 2:00 PM
Interested MBE, WBE, SBE and Section 3 firms may contact Jason Plank at (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on July 9, 2025.
* 07/09/2024- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid*
Bid documents can be obtained from:
City Consultant, BHT Engineering, Inc., 218 S. H Street, Suite 201, Bakersfield, CA 93304
Contact: Juan Pantoja, (661) 558-4641 or juan@bhtengineering.com
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to possess current contractors license as well as current Liability, Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage WBE, MBE, SBE and Section 3 Certified Contractors to contact Cen-Cal Construction to learn what assistance we can provide to you, such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.
Subcontractor and Supplier bids are required by 5:00 PM July 9, 2025.
Bids for the followings Items are being accepted:
Item 1-Cold Plane 3” of Existing Surface, Proof Roll Subgrade, Haul-Off Excess Material
Item 2-Type A Hot Mix Asphalt
Item 3-Install Curb & Gutter
Item 4- Install ADA Curb & Gutter
Item 5- Install Sidewalk
Item 6- Install 8” Thick Concrete X-Gutter/Apron/Alley Approach
Item 7- Class 2 Aggregate Base
Item 8- Adjust Sewer Manhole to New Grades
Item 9- Adjust Water Valve to New Grades
Item 10- Adjust Monuments to New Grades
Item 11- Install White/Yellow Thermoplastic Pavement Markings
Item 12- Install 12” Yellow/White Limit/Crosswalk Line-Thermo.
Item 13- Install 24” Yellow/White Crosswalk Line-Thermoplastic
Item 14- Furnish & Install Solar-Powered Flashing LED Stop Sign
Item 15- Furnish & Install R1-3P Sign
Item 16- Salvage/Re-Install Existing Sign
Item 17- Furnish & Install R1-5 Sign
Item 18- Furnish & Install SW24-2(CA)-FYG Sign
Item 19- Install 6” Yellow Center Line (Detail 2) Thermoplastic
Item 20- Install 6” Yellow Center Line (Detail 22) Thermoplastic
Item 21- Furnish & Install Blue Fire Hydrant Marker
Item 22- Relocate/Adjust Irrigation System-In Kind
Item 23- Prepare & Implement Erosion Control Plan
Item 24- Temporary Traffic Control
Bid Option 1-Sherwood & Perkins Overpasses
Item 25- Cold Plane 3” of Existing Surface, Proof Roll Subgrade, Haul-Off Excess Material
Item 26- Type A Hot Mix Asphalt
Item 27- Install Curb & Gutter
Item 28- Install ADA Curb & Gutter
Item 29- Install Sidewalk
Item 30- Install White Thermoplastic Pavement Markings
Item 31- Install 12” Yellow/White Limit/Crosswalk Line-Thermo.
Item 32- Furnish & Install Solar-Powered Flashing LED Stop Sign
Item 33- Furnish & Install R1-3P Sign
Item 34- Salvage/Re-Install Existing Sign
Item 35- Install 6” Yellow Center Line (Detail 22) Thermoplastic
Item 36- Install 6” White Right Edge Line (Detail 27B) Thermoplastic
Item 37- Install 6” White Channelizing Line (Detail 38B) Thermo.
Item 38- Furnish & Install R3-7R “Right Lane Must Turn Right” Sign
Item 39-Temorary Traffic Control
** Also requesting All Supplier Quotes**
** All Items can be broken down by supplier and install**
PDF ATTACHMENTS: