is seeking certified and qualified DBE subcontractors and/or suppliers to provide Water Pollution Control, Erosion Control, SWPPP, Traffic Control, Construction Area Signs, Flagging, Sweeping, Cold Plane Pavement, Tack Coat, Relocate Mailbox, Adjust Castings, Concrete Removal, Oil, Striping, Signage, Construction Survey, Monument Preservation, Tree Removal, Electrical – Relocate rectangular rapid flashing beacon
Safe Routes to School Sidewalk Gap Closure – Phase 1
Project No. WT19013 / Federal Project No. ATPSB1L-5008(187)
City of Stockton
Various Streets, Stockton, CA, 95202
08-21-2025 at 02:00 PM
Ashley Cruz
209-932-2100
209-948-6652
655 W. Clay Street, Stockton, CA, 95206
PROJECT DETAILS:
Contact Knife River Construction for assistance in obtaining bonds, insurance, lines of credit, equipment, supplies, materials or project plans and specifications.
Knife River Construction is willing to break out any portion of work to encourage DBE participation.
The DBE Contract goal is 22.3 percent for this project.
We are an Equal Opportunity Employer.
Please contact Knife River Construction by 8/20/2025 with quotes.