Trade Journal

Sully-Miller Contracting Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide AC DIKE, BAR REINFORCED STEEL, BRIDGE REMOVAL, BRIDGE STRUCTURE, CLEARING & GRUBBING, COLD MILLING, CONCRETE BARRIER, CONCRETE GRINDING, CONSTRUCTION AREA SIGNS, DOWELS & BASKETS, ELECTRICAL, EROSION CONTROL, FENCING, GEOTEXTILE FABRIC, GUARD RAIL, HYDROSEEDING, JOINT SEAL, K-RAIL, LANDSCAPE/IRRIGATION, LOOPS, MATERIALS, PILING-CIDH/DRIVEN, RCP, RENTAL EQUIPMENT, RETAINING WALL, ROCK SLOPE PROTECTION, SAWCUTTING, SIGN STRUCTURES, SIGNS, STORM DRAIN STRUCTURES, STORM DRAIN, STRIPING/MARKING, SWEEPING, SWPPP, TEMPORARY RAILING, THERMOPLASTIC TRAFFIC STRIPING, TRAFFIC CONTROL, TRUCKING


PROJECT NAME:

CONSTRUCTION ON STATE HIGHWAY ROUTE 5 IN ORANGE COUNTY IN IRVINE AND TUSTIN FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION

BID CONTRACT #:

12-0K62U4, PROJECT ID 1224000090, FEDERAL AID PROJECT ACIM-0052(058)E

AWARDING AGENCY:

CALTRANS

PROJECT LOCATION:

ROUTE 5 FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION, IRVINE & TUSTIN, CA, 92602

BID DUE DATE:

10-21-2025 at 02:00 PM

OUTREACH COORDINATOR:

Jessica Daniels, Estimating Coordinator

TELEPHONE:

17145789600

FAX:

714-578-9672

ADDRESS:

135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821

PROJECT DETAILS:

Sully-Miller Contracting Company

An Equal Opportunity Employer

License No. 747612-A

DIR Registration No. 1000003664

135 S. State College Blvd., Suite 400, Brea, CA 92821

Phone: (714) 578-9600   FAX: (714) 578-9672

Contact: Estimating Department at bids@sully-miller.com

Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website: 

www.sully-millerplans.com, or the CALTRANS website at: www.dot.ca.gov/hq/esc/oe/weekly_ads/adv_priorweek  

Sully-Miller is willing to set aside any portion of work, no matter how small it is to encourage

 (DBE PARTICIPATION) participation. If you require information regarding assistance in obtaining Bonding, Insurance, Credit, Equipment, Supplies, Materials, or Related Services, please call our office.

 Sully-Miller Contracting Company is requesting all qualified Subcontractors/Vendors to please send in a Scope Letter for bid items being priced, 48-72 hours prior to Bid Date & Time so any questions can be addressed by the Estimator.     

100% Payment and Performance Bonds May Be Required

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.