is seeking certified and qualified DBE subcontractors and/or suppliers to provide AC DIKE, BAR REINFORCED STEEL, BRIDGE REMOVAL, BRIDGE STRUCTURE, CLEARING & GRUBBING, COLD MILLING, CONCRETE BARRIER, CONCRETE GRINDING, CONSTRUCTION AREA SIGNS, DOWELS & BASKETS, ELECTRICAL, EROSION CONTROL, FENCING, GEOTEXTILE FABRIC, GUARD RAIL, HYDROSEEDING, JOINT SEAL, K-RAIL, LANDSCAPE/IRRIGATION, LOOPS, MATERIALS, PILING-CIDH/DRIVEN, RCP, RENTAL EQUIPMENT, RETAINING WALL, ROCK SLOPE PROTECTION, SAWCUTTING, SIGN STRUCTURES, SIGNS, STORM DRAIN STRUCTURES, STORM DRAIN, STRIPING/MARKING, SWEEPING, SWPPP, TEMPORARY RAILING, THERMOPLASTIC TRAFFIC STRIPING, TRAFFIC CONTROL, TRUCKING
CONSTRUCTION ON STATE HIGHWAY ROUTE 5 IN ORANGE COUNTY IN IRVINE AND TUSTIN FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION
12-0K62U4, PROJECT ID 1224000090, FEDERAL AID PROJECT ACIM-0052(058)E
CALTRANS
ROUTE 5 FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION, IRVINE & TUSTIN, CA, 92602
10-21-2025 at 02:00 PM
Jessica Daniels, Estimating Coordinator
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department at bids@sully-miller.com
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website:
www.sully-millerplans.com, or the CALTRANS website at: www.dot.ca.gov/hq/esc/oe/weekly_ads/adv_priorweek
Sully-Miller is willing to set aside any portion of work, no matter how small it is to encourage
(DBE PARTICIPATION) participation. If you require information regarding assistance in obtaining Bonding, Insurance, Credit, Equipment, Supplies, Materials, or Related Services, please call our office.
Sully-Miller Contracting Company is requesting all qualified Subcontractors/Vendors to please send in a Scope Letter for bid items being priced, 48-72 hours prior to Bid Date & Time so any questions can be addressed by the Estimator.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: