Trade Journal

Nicholas Construction, Inc.

is seeking certified and qualified DBE, HUD Section 3, MBE, SBA 8(a), SBE, WBE, Labor Surplus Area Firm and Small Business in Rural Area subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, PERMITTING, SCHEDULING, SURVEY, TRUCKING, TEMPORARY FACILITIES, TRAFFIC CONTROL, SIGNAGE, DEMOLITION, POTHOLING, CLEARING AND GRUBBING, TRENCHING, SHORING, EARTHWORK, GRADING, WATERWORKS MATERIALS, PLUMBING, TANKS, PUMPS AND MOTORS, CMU, ROOFING, FRAMING, DOORS AND HARDWARE, READYMIX CONCRETE, AGGREGATE MATERIALS, MISCELLANEOUS METALS, REINFORCING STEEL, WELDING, STEEL PIPING, JACK AND BORE, HYDROSTATIC TESTING, PAINTING AND COATING, HYDROSEEDING, ELECTRICAL AND INSTRUMENTATION


PROJECT NAME:

CACHE CREEK PIPELINE REPLACEMENT

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Mojave Public Utility District

PROJECT LOCATION:

10273 Tehachapi Boulevard, Mojave, CA, 93501

BID DUE DATE:

10-01-2025 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by email request to alex@nicholasconstructioninc.com or available to view in our office upon request.

The majority of work consists, in general, of the construction of a potable water booster pump station and over 6 miles of water pipeline within the hills North and South of State Route 58, East of Cameron Road, and West of the Community of Cache Creek. This includes (x2) jack and bore and (x1) open trench casing installations. 

We will assist with Bonds, Lines of Credit, and Insurance, if needed. 

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.