Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Construction Area Signs, Traffic Control System, Type III Barricade, Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temp. Barrier System (CAL F-23), Portable Changeable Message Sign, Temp. Crash Cushion Tl-2, Temp. Radar Feedback Sign System, Automated Flagger Assistance Device Day, Storm Water Pollution Prevention Plan and Reporting, Lead Compliance Plan, Demolition, Treated Wood Waste, Remove Guardrail, Roadside Clearing, Clearing and Grubbing (LS), Relocate Mailbox, Structural Concrete, Drill and Bond Dowel, Bar Reinforcing Steel, Concrete Backfill(Soldier Pile Wall), 24” Drilled Hole, Timber Lagging, Clean and Paint Steel Soldier Piling, Concrete Surface Texture, Prepare and Stain Concrete, Stain Galvanized Surfaces, Minor Concrete, Minor Concrete (Miscellaneous Construction), Miscellaneous Iron and Steel, Detectable Warning Surface, Drainage Inlets, Alternative Pipe Culvert, Hot Mix Asphalt (TYPEA), Permanent Erosion Control, Temp. Erosion Control, Landscaping, Adjust Utilities, Pedestrian Railing, Cable Railing, Signage, Temporary/Permanent Striping, Electrical, Street Sweeping, and Trucking.


PROJECT NAME:

CONSTRUCTION ON STATE HIGHWAY IN SANTA CRUZ COUNTY FROM 0.1 MILE NORTH OF KIRBY STREET TO 0.1 MILE NORTH OF FALL CREEK DRIVE

BID CONTRACT #:

05-1M4004

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Felton, CA, CA

BID DUE DATE:

09-17-2025 at 02:00 PM

OUTREACH COORDINATOR:

Vicki Narciso

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company ‘Graniterock’ is signatory to Operating Engineers, Laborers, Teamsters, Carpenters, and Cement Masons unions. Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite 220, San Jose, or electronically at Caltrans Office Engineer website http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. 100% payment and 100% performance bonds in the amount of the subcontractor’s bid will be required from a qualified surety company. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work code(s) that apply to the scope of work they are quoting. Graniterock will break down items of work to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite Rock Company is an Equal Opportunity Employer.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.