Trade Journal

Stewart Engineering Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Stewart Engineering Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE, DBE, MBE, WBE, and MB firms. Services needed but not limited to: the following work; Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Radar Speed Feedback Sign Systems (Ls), Portable Changeable Message Sign (EA), End Of Queue Monitoring And Warning With Truck Mounted Changeable Message Sign, Temporary Railing (Type K), Alternative Temporary Crash Cushion Tl-3, Automated Flagger Assistance Device, Job Site Management, Water Pollution Control Program, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist (Ls), Roadway Excavation, Roadway Excavation (Boulder Removal), Rock Excavation, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Drainage Inlet, (F) - Minor Concrete (Minor Structure), 24" Corrugated Steel Pipe (.138" Thick), Remove Culvert (LF), Remove Inlet, Remove Headwall, Rock Slope Protection (60 LB, Class II, Method B) (Cy), Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, Double Twisted Wire Mesh Drapery System, Cable Net Attenuator (Sqft), Cable Net Drapery (Sqft), Remove Existing Rockfall Fence, Marker (Culvert), Remove Marker, Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (8' Steel Post), Buried Post End Anchor (Type B-F), Remove Guardrail, Thermoplastic Traffic Stripe (Sprayable), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Recessed. Stewart Engineering Inc. is an Equal Opportunity Employer and will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units as reasonably necessary.


PROJECT NAME:

FOR CONSTRUCTION ON STATE HIGHWAY IN SHASTA COUNTY NEAR FALL RIVER MILLS FROM 2.7 MILES WEST OF FALL RIVER GOLF ROAD TO 1.2 MILES WEST OF FALL RIVER GOLF ROAD

BID CONTRACT #:

Contract No. 02-1J2904 Federal Aid Project ACPTST-S299(164)

AWARDING AGENCY:

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

PROJECT LOCATION:

02-Sha-299-88.1/89.5, Fall River Mills, CA, 96028

BID DUE DATE:

09-30-2025 at 10:00 AM

OUTREACH COORDINATOR:

Renee Thomas

TELEPHONE:

(530) 244-8464

FAX:

(530) 244-8462

ADDRESS:

P.O. Box 990010, Redding, CA, 96099

PROJECT DETAILS:

Stewart Engineering Inc. will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at your local builders exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to contact our office. In order that we may give your bid maximum consideration, please supply us with a fax or email letter prior to the bid describing the scope of your work. 

Stewart Engineering is signatory to the Labors Union Local 185, Pile Drivers and Operators Union Local 3.  We encourage and actively solicit proposals from DBE subcontractors and suppliers on all our projects. All qualified DBE subcontractors must be registered and certified by the California Department of Transportation. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services etc., which may be required by the Owner.  Subcontractors must possess a current contractor’s license, worker’s compensation and insurance coverage during the entire length of the prime contract.  All Subcontractors will be required to sign our standard Subcontract Agreement (AGC Long Form Standard Subcontract).  If you require an advance copy to of the subcontract to look over please contact our office.  You must be registered and provide your Department of Industrial Relations number.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.