is seeking certified and qualified DBE subcontractors and/or suppliers to provide AC DIKE, ANTI-GRAFFITI COATING, CIDH PILING, CLEARING & GRUBBING, COLD MILLING, CONCRETE BARRIER, CONCRETE GRINDING, CONSTRUCTION AREA SIGNS, DEMOLITION, DRIVEN PILE, ELECTRICAL, FENCING, GROUND ANCHOR, GUARD RAIL, HYDROMULCHING, HYDROSEEDING, JOINT SEAL, LANDSCAPING & IRRIGATION, LEAD COMPLIANCE PLAN, MASONRY BLOCK SOUND WALL, MATERIALS, NOISE MONITORING, PIPE LINING, POLYESTER OVERLAY, PRE/POST SURVEY, PRE-STRESSING, RAPID SET CONCRETE, RCP, REINFORCING STEEL, RENTAL EQUIPMENT, ROADSIDE SIGNS, ROCK BLANKET, ROCK SLOPE PROTECTION, RUMBLE STRIP, SAFETY/QUALITY CONTROL MANAGER, SHOTCRETE, SIGN STRUCTURES, STORM DRAIN STRUCTURES, STREET SWEEPING, STRIPING & MARKING, STRUCTRUAL CONCRETE, SWPPP, TRAFFIC CONTROL, TREATED WOOD WASTE, TREE REMOVAL, TRUCKING, WATER POLLUTION CONTROL PLAN
CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN ORANGE COUNTY IN IRVINE FROM ROUTE 5/405 SEPARATION TO YALE AVENUE OVERCROSSING
12-0K61U4, PROJECT ID 1224000096, FEDERAL AID PROJECT ACIM-0052(059)E
CALTRANS
FROM I-5/405 SEPARATION TO YALE AVENUE OVERCROSSING, IRVINE, CA, 92602
11-18-2025 at 02:00 PM
Jessica Daniels
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department at bids@sully-miller.com
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website:
www.sully-millerplans.com, or the CALTRANS website at: www.dot.ca.gov/hq/esc/oe/weekly_ads/adv_priorweek
Sully-Miller is willing to set aside any portion of work, no matter how small it is to encourage
(DBE PARTICIPATION) participation. If you require information regarding assistance in obtaining Bonding, Insurance, Credit, Equipment, Supplies, Materials, or Related Services, please call our office.
Sully-Miller Contracting Company is requesting all qualified Subcontractors/Vendors to please send in a Scope Letter for bid items being priced, 48-72 hours prior to Bid Date & Time so any questions can be addressed by the Estimator.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: