Pionic Unit Construction Inc

is seeking certified and qualified DBE and DVBE subcontractors and/or suppliers to provide Demolition, Abatement, Concrete, Carpentry, Glazing trades


PROJECT NAME:

SFUSD Administrative Offices (2055 Sunnydale Avenue) - Building Repairs and Maintenance, Project No. 12463

BID CONTRACT #:

12463

AWARDING AGENCY:

San Francisco Unified School District

PROJECT LOCATION:

2055 Sunnydale Ave, San Francisco, CA, 94134

BID DUE DATE:

09-24-2025 at 11:00 AM

OUTREACH COORDINATOR:

Felix Li

TELEPHONE:

650-438-1956

FAX:

650-355-5923

ADDRESS:

315 Sycamore Street, Pacifica, CA, 94044

PROJECT DETAILS:

The Project is generally described as the building exterior and interior repairs including miscellaneous improvements to the spaces currently used by and shared with the Samoan Community Development Center. The work includes, but not necessarily limited to the:

1. Install perimeter fencing with gate at the front courtyard facing the Auditorium.
2. Replace storefront at the main entrance and install exterior cladding with new signage. Paint elected exterior walls.
3.Selective replacement of damaged glazing on all exterior windows.
4. Repairs to the existing main sewer line along Sunnydale Avenue.
5. Replace exterior windows in Cafeteria and Auditorium.
6. Partial removal of stage and enlargement of the main auditorium hall which includes new wood flooring and miscellaneous wall repairs.
7. Repairs and replacement of damaged kitchen exhaust, walk-in refrigerator and miscellaneous mechanical equipment.
8. Install roof coating over the existing roof of the main classroom wing.
9. Additive Alternate No.1, Kalwall panel system in auditorium as generally shown on sheets A2.11 and A2.21.
10. Additive Alternate No. 2, Roof resurfacing restoration system over the Kitchen / Cafeteria Areas as generally shown on sheets A2.45 and A2.47.
11. Additive Alternate No. 3, Roof resurfacing restoration system over the Auditorium Area as generally shown on sheets A2.45 and A2.47.
12. Additive Alternate No. 4, Roof restoration system over the Main Entrance and Administration Offices as generally shown on sheets A2.45 and A2.47.
13. Additive Alternate No. 5, New flooring in the Administration Offices and Corridor as generally shown on sheet A2.21.
14. Additive Alternate No. 6, New lighting on the first and second floor corridors as shown on sheets A2.21, E2.41, and E2.42.
15. Perform hazardous materials and lead paint abatement as described and specified in Specification Section 00 31 26 and Appendix A.

The estimated construction value of the work is $2,500,000.00.

 

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.

 