Trade Journal

Gordon N. Ball, Inc

is seeking certified and qualified DBE subcontractors and/or suppliers to provide ,but not limited to, the following: Construction Area Signs, Traffic Control System, Striping Work, Portable Changeable Message Sign, SWPPP Work, Temporary Erosion Control, Street Sweeping, Clearing & Grubbing, Roadway Excavation, Landscaping, Erosion Control, Steel Soldier Pile (HP 14 X 89), 24" Drilled Hole, Structural Concrete, Bar Reinforcing Steel, Timber Lagging, Clean & Paint Steel Soldier Piling, Minor Concrete, Prepare & Stain Concrete, Sign Work, Railing Work, Electrical, Construction Materials, and Trucking


PROJECT NAME:

Hwy 9 Felton Retaining Walls

BID CONTRACT #:

05-1M4004

AWARDING AGENCY:

California Department of Transportation

PROJECT LOCATION:

Hwy 9, 0.1 Mile North of Kirby Street To 0.1 Mile North of Fall Creek Drive, Felton, Santa Cruz County, CA

BID DUE DATE:

09-17-2025 at 02:00 PM

OUTREACH COORDINATOR:

Serina Sirna-Blach

TELEPHONE:

925-838-5675

FAX:

925-838-5915

ADDRESS:

1777 Oakland Blvd, Ste 300, Walnut Creek, CA, 94596

PROJECT DETAILS:

Plans and Specifications are available for review at our office or can be downloaded from: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-1M4004

Call Serina Sirna-Blach for information on the project, submitting a quote, assistance in obtaining bonds, line of credit, insurance, scheduling accommodations, equipment, supplies, materials and related assistance or services.

Attn: Serina Sirna-Blach

1777 Oakland Blvd, STE 300, Walnut Creek, CA 94596

Phone: (925) 838-5675

Fax: (925) 838-0814

estimating@ballconco.com 

An Equal Opportunity Employer

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.