Trade Journal

Thompson Builders Corporation

is seeking certified and qualified City of San Francisco LBE subcontractors and/or suppliers to provide SELECTIVE DEMOLITION, ENVIRONMENTAL MANAGEMENT OF EXCAVATED MATERIALS, CONCRETE FORMING AND ACCESSORIES, CONCRETE REINFORCING, CAST-IN-PLACE CONCRETE, CONCRETE FINISHING, PRECAST CONCRETE SPECIALTIES, CONCRETE TOPPING, PORTLAND CEMENT UNDERLAYMENT, GROUTING, STRUCTURAL STEEL FRAMING, ARCHITECTURALLY EXPOSED STRUCTURAL STEEL, STRUCTURAL METAL STUD FRAMING, SLOTTED CHANNEL FRAMING, METAL FABRICATIONS, WELDED STEEL GRILLEWORK, PIPE AND TUBE RAILINGS, DECORATIVE METAL, PERFORATED METAL PANELS, MISCELLANEOUS ROUGH CARPENTRY, GYPSUM SHEATHING, INTERIOR ARCHITECTURAL WOODWORK, PLASTIC-LAMINATE-FACED ARCHITECTURAL CASEWORK, TRAFFIC COATINGS, THERMAL INSULATION, CONCRETE VAPOR EMISSION CONTROL, FLUID-APPLIED MEMBRANE WEATHER BARRIER, METAL COMPOSITE MATERIAL PANELS, ULTRACOMPACT SURFACING WALL PANELS, METAL-COMPOSITE-MATERIAL PANELS, METAL SOFFIT PANELS, SBS-MODIFIED BITUMINOUS ROOFING, SHEET METAL FLASHING AND TRIM, FLEXIBLE FLASHING, ROOF SPECIALTIES, MANUFACTURED ROOF CURBS, FALL PROTECTION DEVICES, PEDESTAL MOUNTED PAVERS, SPRAY-ON FIREPROOFING, INTUMESCENT FIREPROOFING, FIRESTOPPING, EXPANSION JOINT SEALS, JOINT SEALANTS, HOLLOW METAL DOORS AND FRAMES, ALUMINUM FRAMES, FLUSH WOOD DOORS, ACCESS DOORS, SLIDING ALL-GLASS DOORS, OVERHEAD COILING DOORS, ELEVATOR DOOR SMOKE CONTAINMENT SYSTEM, SLIDING BARN DOORS, ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS, FIRE-RATED GLAZED INTERIOR FRAMING, GLAZED ALUMINUM CURTAIN WALLS, GYPSUM BOARD SHAFT-WALL ASSEMBLIES, NON-STRUCTURAL METAL FRAMING, PORTLAND CEMENT PLASTER, GYPSUM BOARD, TILING, ACOUSTICAL PANEL CEILINGS, LINEAR SUSPENDED CANOPY CEILING SYSTEM, CONCRETE FLOOR SEALER, RESILIENT FLOORING AND BASE, EPOXY-RESIN TERRAZZO FLOORING, ELASTOMERIC LIQUID FLOORING, FIBERGLASS REINFORCED WALL PANELS, METAL INTERIOR WALL PANELS, ACOUSTICAL ISOLATORS AND DEVICES, ACOUSTIC INSULATION AND SEALANTS, PAINTING AND COATING, HIGH PERFORMANCE COATINGS, GRAFFITI RESISTANT COATINGS, CURTAIN WALL BACK-PAN, ALUMINUM WINDOWS, DOOR HARDWARE, AUTOMATIC DOOR OPERATORS, GLAZING, MIRRORS, WALL LOUVERS, IMPACT RESISTANT PETG-CLAD FLUSH WOOD DOORS, SIGNAGE, DIMENSIONAL LETTER SIGNAGE, PANEL SIGNAGE, SCRC PHENOLIC TOILET COMPARTMENTS, CUBICLE TRACKING SYSTEM, OPERABLE PARTITIONS, GLAZED INTERIOR WALL AND DOOR ASSEMBLIES, WALL PROTECTION AND CORNER GUARDS, DECORATIVE WALL PROTECTION COVERINGS, COMMERCIAL TOILET ACCESSORIES, FIRE PROTECTION SPECIALTIES, PHENOLIC-CORE LOCKERS, WIRE MESH PARTITIONS, BIRD CONTROL DEVICES, INTEGRATED PEST MANAGEMENT, EXTERIOR GRILLES AND SCREENS, LOCK BOXES, APPLIANCES, HEALTHCARE EQUIPMENT, ROLLER WINDOW SHADES, COUNTERTOPS, ENTRANCE FLOOR MATS, BICYCLE RACKS, ELECTRIC TRACTION PASSENGER ELEVATORS, WATER BASED FIRE SUPPRESSION SYSTEM, GENERAL REQUIREMENTS FOR PLUMBING, COMMON WORK RESULTS FOR PLUMBING, HANGERS AND SUPPORTS FOR PLUMBING, VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT, IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT, PLUMBING INSULATION, COMMISSIONING FOR PLUMBING SYSTEMS, PLUMBING PIPING, DOMESTIC WATER SYSTEM, PLUMBING EQUIPMENT, PLUMBING FIXTURES, COMMON WORK RESULTS FOR HVAC, HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT, VIBRATION AND SEISMIC CONTROLS FOR HVAC, IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT, TESTING, ADJUSTING, AND BALANCING FOR HVAC, HVAC INSULATION, COMMISSIONING OF MECHANICAL SYSTEMS, INSTRUMENTATION AND CONTROLS FOR HVAC, REFRIGERANT PIPING, HVAC DUCTS AND CASINGS, AIR DUCT ACCESSORIES, HVAC FANS, AIR TERMINAL UNITS, AIR INLETS AND OUTLETS, INDOOR CENTRAL-STATION AIR HANDLING UNITS, VARIABLE REFRIGERANT FLOW HVAC SYSTEMS, ELECTRICAL GENERAL REQUIREMENTS, BASIC ELECTRICAL MATERIALS & METHODS, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS, UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY, SHORT CIRCUIT COORDINATION AND ARC FLASH STUDY, COMMISSIONING OF ELECTRICAL SYSTEMS, PROTECTIVE RELAYS AND CONTROLLERS, NETWORKED LIGHTING CONTROLS, UNIT SUBSTATIONS, MEDIUM VOLTAGE TRANSFORMERS, MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR, LOW-VOLTAGE DISTRIBUTION TRANSFORMERS, SWITCHBOARDS, PANELBOARDS, POWER AND ENERGY METERS, ENCLOSED SWITCHES AND CIRCUIT BREAKERS, PHOTOVOLTAIC POWER SYSTEM, ELECTRIC VEHICLE CHARGING STATIONS, LIGHTING, COMMON WORK RESULTS FOR COMMUNICATIONS, GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS, HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS, CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS, CABLE TRAYS FOR COMMUNICATIONS SYSTEMS, UNDERGROUND DUCTS AND RACEWAYS FOR COMMUNICATIONS SYSTEMS, IDENTIFICATION FOR COMMUNICATIONS SYSTEMS, STRUCTURED CABLING, BASIC MATERIALS AND METHODS, COMMUNICATION CABINETS, RACKS, FRAMES AND ENCLOSURES, COMMUNICATIONS TERMINATION BLOCKS AND PATCH PAN ELS, COMMUNICATIONS CABLE MANAGEMENT, COMMUNICATIONS INDOOR BACKBONE CABLING, COMMUNICATIONS OUTSIDE PLANT BACKBONE CABLING, COMMUNICATIONS HORIZONTAL CABLING, INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT, SOUND MASKING SYSTEMS, COMMON WORK RESULTS FOR ELECTRONIC SECURITY, ACCESS CONTROL, VIDEO SURVEILLANCE, FIRE ALARM SYSTEMS, ELECTRONIC DETECTION AND ALARM, SITE PREPARATION, EXCAVATION AND FILL, JOINT TRENCH AND APPURTENANCES, TRENCHING AND BACKFILLING, DRILLED CONCRETE PIERS AND SHAFTS, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS, BASE COURSE, FLEXIBLE PAVING, CONCRETE CURBS AND GUTTERS, PAVEMENT MARKINGS AND SIGNAGE, TACTILE WARNING SURFACING, CHAIN LINK FENCES AND GATES, SITE SEATING, MANHOLE GRADE ADJUSTMENT, UTILITY STRUCTURES, COMBINED SANITARY STORM SEWER UTILITIES, SANITARY SEWERAGE UTILITY PIPING, STORM DRAINAGE UTILITIES,


PROJECT NAME:

Chinatown Public Health Center Renovation

BID CONTRACT #:

0000010892

AWARDING AGENCY:

San Francisco Public Works Department of Public Health

PROJECT LOCATION:

1490 Mason Street, San Francisco, CA, 94133

BID DUE DATE:

10-15-2025 at 02:30 PM

OUTREACH COORDINATOR:

Kelsey Heaphy

TELEPHONE:

4154568972

FAX:

415-459-0665

ADDRESS:

5400 Hanna Ranch Road, Novato, CA, 94945

PROJECT DETAILS:

GOALS: LBE 20% (10% must be Micro-LBE)

Please submit bids to us by 2:30pm on bid day.

 

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 

 

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. 

 

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday  from 7:30 AM to 4:00 PM.  Plans and specifications may be emailed upon request or downloaded from the following link:  

 

https://tpcorp.box.com/s/z3hq6zk4pzsv0fkystx7gazaqtcro2o9

 

Thompson Builders Corporation is an Equal Opportunity Employer

 Contact:  Kelsey Heaphy 

PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.