is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Survey, Demolition, Cast-in-Place Concrete, Concrete Reinforcing, Unit Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Rough Carpentry, Finish Carpentry, FRP, Fire and Smoke Assembly Identification, Thermal Insulation, Weather Barriers, Cementitious Wall Panels, Thermoplastic Membrane Roofing, Sheet Metal Flashing and Trim, Hollow Metal Doors and Frames, Access Doors and Panels, Glazing, Gypsum Board Assemblies, Plaster, Tiling, Acoustical Ceilings, Wood Stage Flooring, Resilient Flooring, Tile Carpeting, Fluid-Applied Flooring, Fixed Sound-Reflective Panels, Painting, Visual Display Units, Signage, Restroom accessories, Metal Lockers, Foodservice Equipment, Audio-Video Equipment, Platform and Studio Curtains, Playground Equipment, Athletic Field Equipment, Window Shades, Fabric Structures, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Drilled Concrete Piers and Shafts, Asphalt Paving, Concrete Paving, Pavement Markings, Playground Protective Surfacing, Decorative Metal Fences and Gates, Landscape, Site Utilities, Final Cleaning
Franklin E.S MPR Bldg.
2026-03-FAC-GC
Anaheim Elementary School District
521 W. Water Street, Anaheim, CA, 92805
10-30-2025 at 02:00 PM
Eddie Howard
(714)745-7930
Not Available
1800 E McFadden Ave, Santa Ana, CA, 92705
PROJECT DETAILS:
Scope of Work: The scope of work for this project consists of Survey, Demolition, Cast-in-Place Concrete, Concrete Reinforcing, Unit Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Rough Carpentry, Finish Carpentry, FRP, Fire and Smoke Assembly Identification, Thermal Insulation, Weather Barriers, Cementitious Wall Panels, Thermoplastic Membrane Roofing, Sheet Metal Flashing and Trim, Hollow Metal Doors and Frames, Access Doors and Panels, Glazing, Gypsum Board Assemblies, Plaster, Tiling, Acoustical Ceilings, Wood Stage Flooring, Resilient Flooring, Tile Carpeting, Fluid-Applied Flooring, Fixed Sound-Reflective Panels, Painting, Visual Display Units, Signage, Restroom accessories, Metal Lockers, Foodservice Equipment, Audio-Video Equipment, Platform and Studio Curtains, Playground Equipment, Athletic Field Equipment, Window Shades, Fabric Structures, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Drilled Concrete Piers and Shafts, Asphalt Paving, Concrete Paving, Pavement Markings, Playground Protective Surfacing, Decorative Metal Fences and Gates, Landscape, Site Utilities, Final Cleaning
Subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, who have not been prequalified, shall be deemed nonresponsive and will not be considered. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid. This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above.
Project Labor Specifics: Prevailing Wage
Insurance Requirements: Special Provisions Page 31-2 in Bid Documents
Liquidated Damages: $1,500
Construction Time: 427 Calendar Days
Start Date: Estimated December 2025
Finish Date: Estimated February 2027
The KYA Group may require all subcontractors bidding on projects to provide payment and performance bonds in the amount of 100% of the subcontract amount. KYA will assist with the bond premium up to 1.5% of the original contract amount for the duration of the project. KYA may waive the bond requirement at its sole discretion. The payment and performance bonds must be issued by an admitted surety within ten (10) business days of the receipt of the subcontract Agreement from KYA. KYA shall be named the oblige and shall guarantee prompt and faithful performance of the subcontract scope of work and the payment of all claims for labor and material furnished or used in and about the work to be done and performed under the subcontract agreement. When so requested, failure by the subcontractor to provide the requested 100% payment and performance bonds within the time allowed may be reason for KYA to request substitution of the subcontractor in accordance with section 4107 0f the Public Contracting Code.
The KYA Group, listing of a subcontractor is not an acceptance of any or all of that Subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that KYA bid must remain valid with the owner, as specified in the project’s specifications. Each listed Subcontractor must execute KYA’s standard subcontract agreement if KYA is awarded the project. Subcontractor must submit pay applications-including invoices, sworn statements, and conditional and/or unconditional lien waivers.
If the project is subject to a project Labor Agreement or Project Stabilization Agreement, subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements and further agrees to adhere to all of the requirements as provided in the bid documents General conditions and supplemental Conditions.
As of June 20, 2014 the State of California passed a law that requires all contractors bidding or working on ANY public works project to register with the State Department of Industrial Relations (DIR) and pay an annual registration fee. Starting March 1, 2015, any contractor bidding on a public works project must be registered with the DIR in order for their bid to be deemed responsive. As of April 1, 2015, all contractors awarded a public works contract must be registered with the DIR. Subcontractors providing bids or work without DIR registration will result in a DIR penalty.
Special Notice to All Subcontractors
Non-Price terms included in competitive bids at bid time, may cause your bid to be as non-responsive. KYA Group will not accept any provisions or qualifications in subcontractor bids that are not in the bid documents. By submitting a bid on this project, Subcontractor acknowledges that KYA group is relying on the price terms of your quote and that any non-price terms contrary to or in addition to the provisions in the bid documents are null and void.