Erickson-Hall Construction Co

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, AND MUSIC BUILDING. The scope includes construction a 2-story 30,181 SF classroom / administration building, Modernization of exisiting music building, fire alarm upgrades, and associated site improvements, including but not limited to site demolition, select interior demolition, grading, site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acostical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage. Job Walk - 04/28/22 - 10am @ main parking lot Budget $32,000,000.00 All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. Prequalification materrials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall (760) 769-7700


PROJECT NAME:

Magnolia HS Center of Excellence

BID CONTRACT #:

C-32185

AWARDING AGENCY:

Erickson-Hall Construction Co.

PROJECT LOCATION:

2450 W. Ball Road, Anaheim, CA, 92804

BID DUE DATE:

05-10-2022 at 02:00 PM

OUTREACH COORDINATOR:

Laura Cullifer

TELEPHONE:

7607967700

FAX:

7607967750

ADDRESS:

500 Corporate Drive, Escondido, CA, 92029

PROJECT DETAILS:

ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, AND MUSIC BUILDING.
The scope includes construction a 2-story  30,181 SF classroom / administration building, Modernization of exisiting music building, fire alarm upgrades, and associated site improvements,  including but not limited to site demolition, select interior demolition, grading,  site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acostical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage.

Job Walk - 04/28/22 - 10am @ main parking lot

Budget $32,000,000.00

If you are planning to bid this project, we encourage your participation and welcome your bid.  All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.  Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security.  Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees.  We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.

Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html.  SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.