Trade Journal

Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Clear & Grub, Erosion Control, Slope Protection, Excavation, Grading & Site Surfacing, Electrical Equipment & Controls, Plant SCADA modifications, Chemical Metering Pump, Concrete Tank Foundation, 80,000-Gallon Bolted Steel Water Tank, 10,000-Gallon Bolted Steel Water Tank, Yard Piping & Valving, Valley Gutters & Drains, Demolition Redwood Water Tank & Concrete Footing, Site Restoration, Tank Foundation, Fencing, 3” HDPE Water Pipe, Reconnect Services to Existing Water Meters, Access Road Stabilization, Booster Pump Station, Electrical & Instrumentation


PROJECT NAME:

Phase 3 Tank Replacement (Campbell Field)

BID CONTRACT #:

022166

AWARDING AGENCY:

Hoopa Valley Public Utilities District

PROJECT LOCATION:

596 Loop Road, Hoopa, CA, 95546

BID DUE DATE:

10-30-2025 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

PDF ATTACHMENTS:

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.