is seeking certified and qualified DBE subcontractors and/or suppliers to provide mobilization, trucking, demobilization, traffic control, traffic control plan, stormwater pollution control, storm water pollution control plan, dust control plan, dust control, demolition, demo, clearing and grubbing, sawcutting, saw cutting, class II aggregating base, hot mix asphalt, type a asphalt, concrete, install detectable warning surface, commercial driveway, curb and gutter, concrete supplier, asphalt supplier, signage, striping and marking,
Whitley Ave Pedestrian Facility Improvements Project Phase 1
5225(035)
City of Corcoran
Whitley Ave, Corcoran, CA, 93212
10-21-2025 at 02:00 PM
Jason Plank
661-399-3759
661-399-3812
34762 Lencioni Avenue , Bakersfield, CA, 93308
PROJECT DETAILS:
PO BOX 81737
BAKERSFIELD, CA 93380
OFFICE: (661) 399-3759
FAX: (661) 399-3812
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DBE Contractors or Suppliers.
Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
Whitley Ave Pedestrian Facility Improvements Project (Phase 1).
To be located in the City of Corcoran and funded in whole or part by federal funds.
Bid Date: October 21, 2025 @ 2:00PM
Interested certified firms may contact Jason Plank @ (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on October 20, 2025.
** 10/20/2025 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**
Bid documents and addendums can be obtained from:
A&M Consulting Engineers located at 220 N Locust Street, Visalia, CA 93291. Phone: (559) 429-4747
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Cen-Cal Construction to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.
Subcontractor and Supplier bids are required by 5:00 PM October 20, 2025.
Bids for the followings Items are being requested:
Item 1-Mobilization & Demobilization
Item 2-Traffic Control Plan
Item 3-Stormwater Pollution Plan
Item 4-Dust Control Plan
Item 5-Demolition, Cleaning & Grubbing
Item 6- Sawcut
Item 7-Class II Aggregate Base
Item 8-Hot Mix Asphalt, Type A
Item 9-Construct 4” Thick Concrete
Item 10-Install Detectable Warning Surface
Item 11-City Standard Commercial Driveway
Item 12 Construct 8” Curb & Gutter
Item 13-Signage, Striping & Markings complete and in place