is seeking certified and qualified DBE, DVBE, LGBTBE, MBE, Port of Long Beach DBE, SBE and WBE subcontractors and/or suppliers to provide Demolition, Grading, Tree Removal, Paving, SWPPP, Fencing, Signage, Misc. Metals, Structural Steel, Concrete, Rebar, Generator, Electrical, Instrumentation, Traffic Control etc.
SEWER LIFT STATION 101 BACKUP GENERATOR
HD-S3104
Port of Long Beach
101 Pico Ave, Long Beach, CA, 90802
10-14-2025 at 02:00 PM
Udit Tambe
9495154350 x21
9495154351
2610 Avon Street, Newport Beach, CA, 92663
PROJECT DETAILS:
PROJECT DETAILS:
Scope: The Work required by this Contract includes, but is not limited to, the following: a new standby diesel generator with integral sub-base fuel tank and level 2 sound enclosure, generator access platform, a new automatic transfer switch (ATS), and site improvements. The site improvements include gravel roadway for fuel truck, new fencing, and graded area around the proposed generator pad. The fuel tank will be sized for 48 hour run time operating at full load. The new generator will be located north-east of the SLS, past the overhead pass, within Port’s property. The existing manual transfer switch (MTS) will be replaced by the new ATS. The generator will be accessible from South Harbor Scenic Drive.
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regards to race, color, religion, sex or national origin.
Plans & specs are available online using the link below.
Link: https://vendors.planetbids.com/portal/19236/bo/bo-detail/133039
Plans & specs are available to view in our office.
Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Please contact Udit Tambe for any further assistance.
PDF ATTACHMENTS: