is seeking certified and qualified DVBE subcontractors and/or suppliers to provide SWPPP, FINAL CLEAN, SURVEYING, DEMOLITION, HAZARDOUS MATERIAL HANDLING, REINFORCING STEEL, CIP CONCRETE, SEALED/POLISHED CONCRETE, BRICK VENEER, STRUCTURAL STEEL, METAL DECK, HANDRAILS AND RAILINGS, FINISH CARPENTRY, CABINETS AND MILLWORK, WATERPROOFING, INSULATION, AIR BARRIERS, ROOFING, METAL ROOFING, SHEET METAL FLASHING AND TRIM, METAL SIDING AND COMPOSITE WALL CLADDING, DOORS, FRAMES AND HARDWARE, OVERHEAD DOORS, GLASS, STOREFRONTS AND CURTAIN WALLS, GLAZING FILMS, DRYWALL AND METAL STUDS, LATH AND PLASTER, CERAMIC TILE, ACOUSTICAL CEILINGS, CARPET AND RESILIENT FLOORING, WOOD FLOORING, ATHLETIC FLOORING, WALL COVERING, PAINTING, WHITEBOARDS, SIGNAGE, TOILET PERTITIONS AND BATHROOM ACCESSORIES, FIRE EXTINGUISHERS AND CABINETS, LOCKERS, PROJECTION SCREENS, ATHLETIC EQUIPMENT, GYMNASIUM EQUIPMENT, SCOREBOARDS, TELESCOPING BLEACHER SEATING, FIRE SPRINKLERS, PLUMBING, HVAC, HVAC CONTROLS, ELECTRICAL, COMMUNICATIONS, INTERCOM SYSTEMS, AUDIO VISUAL, FIRE ALARM SYSTEM, INTRUSION DETECTION, EARTHWORK, AC PAVING, SITE CONCRETE, LANDSCAPING AND IRRIGATION, SITE UTILITIES
San Clemente High School New Gymnasium
2526-01
Capistrano Unified School District
700 Avenida Pico, San Clemente, CA, 92673
11-06-2025 at 02:00 PM
Alicia Daniel
9516781038
9516781083
22710 Palomar Street, Wildomar, CA, 92595
PROJECT DETAILS:
PROJECT DESCRIPTION:
This project entails the construction of a new single-story, 26,258-square-foot gymnasium with integrated locker room facilities. Designed as a modern venue for athletics and large-scale assembly functions, the building features a structural steel frame with SBS modified and metal roofing, complemented by drywall and metal stud interior/exterior construction. Exterior finishes include plaster, brick veneer, and architectural metal panels.
The facility will be fully equipped with new mechanical, electrical, plumbing, and fire sprinkler systems. Interior spaces are tailored to athletic use, incorporating high-quality wood and resilient rubber sports flooring, telescoping bleachers, custom locker installations, and acoustical paneling to enhance performance and spectator experience.
v Estimated Cost: $22,500,000
v Project Duration: 24 Months (733 Calendar Days)
v Prevailing Wage Project
v All subcontractors may be required to bond over $150,000 (Submit bond rate with bid)
v Liquidated Damages $4,500/Day
v Hold Bids for 90 days