Trade Journal

W. M. Lyles Co.

is seeking certified and qualified DBE, HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide Electrical, Earthwork, Rebar, Painting, Masonry, Roofing, HVAC, Fencing, Plumbing, Buildings, Aggregate Materials, Pipe Materials and Valves, Chemical Equipment, Ready-mix Concrete, Miscellaneous Metals, Doors, Precast Concrete Structures


PROJECT NAME:

Parlier Wastewater Treatment Plant Improvements

BID CONTRACT #:

Not Available

AWARDING AGENCY:

City of Parlier

PROJECT LOCATION:

9477 S Bethel Ave, Parlier, CA, 93648

BID DUE DATE:

12-03-2025 at 02:00 PM

OUTREACH COORDINATOR:

Scott Fults

TELEPHONE:

(661) 387-1600

FAX:

Not Available

ADDRESS:

P.O. Box 28130, Fresno, CA, 93729

PROJECT DETAILS:

This project consists of the replacement of an existing aerated lagoon wastewater treatment plant with a new extended aeration treatment facility. The new treatment facility will provide aeration via turbo blowers and floating aerator chains with motorized butterfly valves. Secondary treatment will be provided by two circular clarifiers with spiral blade scrapers, density current baffles, and fiber glass weirs. Sludge will be pumped by three self-priming 
chopper pumps and either recirculated to the plants new influent structure or directed to the high-rate textile media sludge drying beds for dewatering. Polymer will be injected prior to the discharge of the sludge into the sludge drying beds. Scum collected by the secondary clarifiers will also be pumped via submersible pumps to the sludge drying beds. The water collected by the sludge drying beds will be directed to a drain pump station where two submersible pumps will recirculate the drain water back into the plant. Plant effluent will be collected within existing storage ponds and distributed to four new reclamation fields via two mixed flow impeller vertical turbine pumps. All new equipment will be housed in CMU buildings.

WML actively invites and encourages all certified DBE Firms during our bidding processes. We are an equal opportunity employer. The plans and specs are available for your review at our office. We accept bids on any and all portions of work. We will receive pricing for a breakdown of items. For example, a painting scope could be broken out into above-grade piping, below-grade piping, building coatings, equipment coatings, CMU wall protective coating, chemical floor coating, etc. We can make efforts to establish delivery schedules, where requirement permits, to encourage your participation. We actively invite and encourage all certified DBE Firms during our bidding processes.  If the project has a specified GFE, WML also requires subcontractors to follow the same required steps. We encourage DBE companies to contract with a consortium of DBEs when a contract is too large for your firm to handle individually. We will work with certified DBE’s that group together if the scope of work is too large for one firm. W. M. Lyles Co. and all subcontractor/suppliers shall abide by the requirements of 41 CFR §§ 60-1.4(a), 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity, national origin, or for inquiring about, discussing, or disclosing information about compensation. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, protected veteran status or disability.  By submitting a proposal you agree to comply with all the provisions set forth in 29 CFR Part 471, Appendix A to Subpart A (Executive Order 13496).

Project Clarifications:
The plans and specifications available for review are “As Advertised” and “For Information Only”. We highly encourage all subcontractors and suppliers to request and procure with the owner their own project documents in order to receive any and all updates via addendum. 

Contractor License Number, DIR Registration Number and DBE Certification must be included with any bid submission. 
Please note that all California public works projects are prevailing wage projects and that WML is signatory to the Carpenters, Cement Masons, Laborers, and Operator Engineers Unions.


Please note that you may be required to furnish a 100% Payment & Performance Bond from an approved surety based on the amount of the bid. The Bond costs, based on your provided bid day rate, will be paid by W. M. Lyles Co. Please include your bond rate with your proposal. 


This project DOES require AIS “American Iron & Steel”. 

Thank you in advance for your assistance with this project.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.