Erickson-Hall Construction Co

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE WASHINGTON MIDDLE SCHOOL TRANSFORMATION – INCREMENT 2A Increment 2A of the comprehensive modernization project at Washington Middle School in Long Beach. This early-procurement increment covers furnishing and installing structural steel, metal deck, miscellaneous metals, railings, and elevators for the entire project, including a 118,531 SF three-story classroom building (Building 1000), a parking structure with rooftop field (Building 2000), a 42,687 SF gymnasium/classroom building (Building 3000), and a 16,440 SF auditorium (Building 4000). The purpose of this separate increment is to expedite detailing, BIM coordination, and material procurement to support the overall project schedule. Scope of work in this phase of the project includes, but not limited to: Structural Steel, Metal Deck, Miscellaneous Metals, Railings, and Elevators.


PROJECT NAME:

Washington Middle School Transformation - Inc 2A

BID CONTRACT #:

Not Available

AWARDING AGENCY:

1450 Cedar Avenue

PROJECT LOCATION:

Long Beach, CA, 90813

BID DUE DATE:

12-04-2025 at 02:00 PM

OUTREACH COORDINATOR:

Summer Lumpkin

TELEPHONE:

760-796-7700

FAX:

Not Available

ADDRESS:

500 Corporate Drive, Escondido, CA, 92029

PROJECT DETAILS:

Job Walk: November 6th, 2025 @ 8:00 AM (non-mandatory)

RFI Deadline: November 18th, 2025

Bid Date: December 4th, 2025 @ 2:00 PM

Lead Estimator: Travis Miinch 

Project Address: 1450 Cedar Avenue, Long Beach, CA 90813

Bid Documents can be obtained by visiting our BuildingConnected Portal or by contacting planroom@ericksonhall.com 

All bids are to be submitted via Building Connected and by emailing bids@ericksonhall.com

This project requires Prevailing Wage, Skilled & Trained Workforce

This project is subject to an Owner Controlled Insurance Program (OCIP). Subcontractors of all tiers must have an EMR of 1.24 or less at the time of enrollment and not greater than 1.5 over the last 5 years.

This project requires prequalification.  Long Beach Unified School District requires all general contractors and all mechanical, electrical and plumbers (MEP) subcontractors utilizing any of the following licenses be prequalified with the District: General Contractors (A and B) and Subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46)

Long Beach Unified uses QualityBidders (https://www.qualitybidders.com/) to manage prequalification.   

If you are planning to bid this project, we encourage your participation and welcome your bid.  All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.  Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security.  Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees.  We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.

Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html.  SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial elations pursuant to Labor Code section 1725.5).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.