is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE WHITTIER ELEMENTARY STORM DRAIN IMPROVEMENTS Scope of work to include: The proposed scope of work includes storm drain improvements at Whittier Elementary School. Work shall include, but is not limited to, utility demolition, installation of new reinforced concrete pipe (RCP) & PVC storm drain and associated structures, asphalt patch-back, grind and overlay, and implementation of traffic control measures.
Whittier ES Storm Drain Improvements
Not Available
Erickson-Hall Construction Co.
400 W Whittier Ave., Hemet, CA, 92543
11-20-2025 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
Bid Date: November 20, 2025, at 2:00PM
Job Walk: No Job walk will be held. Feel free to visit the site as all work is offsite in the Right of Way.
Lead Estimator: Chris Moore, cmoore@ericksonhall.com
Project Address: 400 W Whittier Ave. Hemet, CA 92543
Bid Documents can be obtained by visiting our BuildingConnected Portal or by contacting planroom@ericksonhall.com
All bids are to be submitted via Building Connected and by emailing bids@ericksonhall.com
This project requires Prevailing Wage, Skilled & Trained Workforce
Contractors that intend to bid or propose to perform work under a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46 license (s) and that intend to bid or submit a proposal as a first-tier subcontractor to a general contractor (prime contractor) that is bidding or submitting a proposal directly to the District. Copy and Paste Link to access Prequalification Application. https://www.hemetusd.org/page/contractor-pre-qualification-and-registration
If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security. Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html. SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).