is seeking certified and qualified City of San Diego SLBE/ELBE subcontractors and/or suppliers to provide SITE DEMOLITION, EARTHWORK, CONCRETE, MASONRY, STRUCTURAL STEEL, METAL FRAMING AND DRYWALL, METAL FABRICATIONS, ROUGH CARPENTRY, CASEWORK, ROOFING, WATERPROOFING, DOORS, FRAMES, HARDWARE, OVERHEAD DOORS, PAINTING, TOILET ACCESSORIES, FIRE ACCESSORIES, SIGNAGE, SPORT COURT SURFACING, SPORT COURT EQUIPMENT, PLAYGROUND SURFACING, PLAYGROUND EQUIPMENT, DOG PARK EQUIPMENT, SITE FURNISHINGS, PERGOLA, PLUMBING, HVAC, TAB FOR HVAC, ELECTRICAL, FENCES AND GATES, BIORETENTION BASIN, LANDSCAPING & IRRIGATION, ASPHALT PAVING, PAVEMENT STRIPING & SIGNAGE, UTILITIES, SWPPP
Black Mountain Ranch Community Park Phase II
BMR - 001
Lennar Corporation (San Diego)
14700 Carmel Valley Rd, San Diego, CA, 92129
12-03-2025 at 02:00 PM
Maranda Maliska
619-784-2704
805-614-9909
4350 EXECUTIVE DRIVE, SUITE 205, SAN DIEGO, CA, 92121
PROJECT DETAILS:
Project Description
Edwards Construction Group is currently pursuing the Black Mountain Ranch Community Park Phase II project for the Lennar Corporation & the City of San Diego.
!!! There is a 269 Line-Item Bid Schedule !!!
Your proposal MUST follow the bid schedule to be considered. NO EXCEPTIONS!
A copy of the bid schedule is included in the bid documents under "Specifications", labeled "0 BID SCHEDULE."
SCOPE OF WORK
Construction of Black Mountain Ranch Park Phase II shall include, but not be limited to, grading, storm drain, and erosion control improvements; a new parking lot with associated lighting, sidewalks, and trash enclosure; decomposed granite (DG) pathways with a continuous lighting loop; landscaped planting and irrigation areas; bioretention basins; and related utility and electrical work. Improvements also include a new dog park, restroom building, sport courts, playground, and open field, along with site furnishings, shade structures, and other site amenities as shown in the construction documents. Work under this contract is divided into a Base Bid and multiple Add Alternates (Attachments B.0 through B.9 on RFP) as identified in the Bid Forms and Attachment J – Phased Construction Plan.
Est Construction Budget: $8,300,000
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
There is a 10.2% ELBE Participation requirement.
There is a 7.9% SLBE Participation requirement
BID DATE - Tuesday, December 2, 2025 @ 5:00PM
Please note that the listed due date and time is the time that we request all bids be sent to us to be considered.
RFI & SUBSTITUTION REQUEST DUE DATE - Wednesday, November 19, 2025 @ 2:00PM
Send all RFIs & Substitution Requests to the emails listed below.
Please call or email if you have any questions.
Thank you,
Maranda Maliska
Estimating
Office: 619-784-2704
E-mail: estimatingsd@weareedwards.com & maranda@weareedwards.com