Trade Journal

Thompson Builders Corporation

is seeking certified and qualified SBE subcontractors and/or suppliers to provide SECTION 23 - PREPARATORY WORK Article 23.01 Mobilization Article 23.02 Clearing and Grubbing Article 23.03 Demolition Article 23.04 Abandonment, Removal, Salvage, and Relocation of Existing Features Article 23.05 Control of Water Article 23.05.01 Filter Fabric Article 23.06 Erosion control Article 23.07 Pipeline Dewatering Article 23.08 Naturally Occurring Asbestos Materials Abatement Article 23.09 Stabilization Fabric SECTION 24 - EARTHWORK Article 24.01 Excavation and Backfill Article 24.02 Controlled Density Fill Article 24.03 Exploratory Investigation Article 24.04 Trench Excavation Article 24.05 Trench Backfill Article 24.06 Aggregated Base Course Article 24.07 Pipe Bedding Article 24.07.01 Select Backfill Article 24.12 Type "A" Backfill Article 24.13 Type "B" Backfill Article 24.16 Shoring and Bracing Article 24.18 Geotechnical Instrumentation and MonitoringSECTION 26 - PAVING, CURB/GUTTER, SIDEWALK Article 26.01 Asphalt Paving Article 26.02 Roadway Restoration Article 26.03 Curb, Gutter, Sidewalk, and Driveway Restoration SECTION 28 - TRAFFIC CONTROL Article 28.01 Traffic Control SECTION 29 - FENCING AND GATES Article 29.01 Chain Link Fencing Article 29.02 Welded Wire Mesh Fencing SECTION 30 - CONCRETE Article 30.01 Concrete - General Article 30.07 Precast Concrete Structures Article 30.09 Formwork and Falsework Article 30.10 Reinforcement Article 30.11 Joints, Waterstops, and Sealants Article 30.13.05 Precast Vaults Article 30.16 Grout Article 30.16.05 Field-Placed Grout for Collapsed Liner SECTION 32 - PIPING Article 32.01 General Piping Requirements Article 32.03 Pipe Hangers and Supports Article 32.05 Miscellaneous Piping and Piping Specialties Article 32.06 Hydrostatic Testing Article 32.12 Welded Steel Pipe Article 32.18 Tension Anchorage Article 32.21 Internal Pipeline Joint Seals Article 32.22 Support for Internal Pipeline Work Article 32.23 Internal Pipeline Work and Debris Removal Article 32.24 Internal Pipeline CFRP Liner Repair of Distressed PCCP Article 32.30 Steel Liner Installation in Existing PCCP Article 32.31 Fabricated Steel Plate Pipe and Fittings Article 32.32 Field Installation Of Fabricated Steel-Plate Pipe [K-Pipe] SECTION 34 - VALVES AND ACTUATORS Article 34.01 Valves and Actuators - General Article 34.02 Butterfly Valves Article 34.03 Ball Valves Article 34.05 Gate Valves Article 34.13 Air Valves Article 34.15 Valve ActuatorsSECTION 36 - SPECIAL CONSTRUCTION AND STRUCTURES Article 36.02 Metal Article 36.07 Catwalks, Stairs, and Ladders Article 36.12 Hatches, Roof Scuttle SECTION 37 - ELECTRICAL Article 37.01 General Electrical Requirements Article 37.02 Electrical Demolition and Modifications Article 37.05 Protective Device Coordination Study Article 37.07 General Electrical Design Installation Requirements Article 37.08 Miscellaneous Electrical Devices Article 37.09 Grounding System Article 37.10 Conduits, Boxes, and Fittings Article 37.11 Surface Runway Article 37.18 Wiring Devices Article 37.20 Electric Motors Article 37.31 Panel Boards Article 37.38 Lighting Article 37.41 Electrical Testing SECTION 38 - INSTRUMENTATION AND CONTROL Article 38.02 Control Panels, Enclosures, and Panel Components Article 38.05 Flow Instruments Article 38.06 Pressure Instruments Article 38.07 Level Instruments Article 38.08 Temperature Instruments Article 38.14 Instrument List SECTION 39 - CORROSION CONTROL Article 39.01 Corrosion Control - General Article 39.04 Corrosion Control Test Stations Article 39.05 Alumino-Thermic Welds Article 39.07 Bitumastic Coating Article 39.08 Wire, Cable, and Conduit Article 39.11 Identification Tags SECTION 40 - COATING, LINING, AND PAINTING Article 40.01 Lining and Coating - Piping & Valves Article 40.02 Painting and Coating - General Article 40.08 Cement Mortar Pipe Lining and Coating Article 40.13 Field Applied Mortar Lining and Coating


PROJECT NAME:

Almaden Valley Pipeline Replacement Project – Phase 1

BID CONTRACT #:

Project No. 92304001

AWARDING AGENCY:

Santa Clara County

PROJECT LOCATION:

San Jose, CA, 95118

BID DUE DATE:

12-17-2025 at 02:00 PM

OUTREACH COORDINATOR:

Kelsey Heaphy

TELEPHONE:

4154568972

FAX:

4154590665

ADDRESS:

5400 Hanna Ranch Road, Novato, CA, 94945

PROJECT DETAILS:

Please submit bids to us by 2pm on bid day.

 

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 

 

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. 

 

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM.  Plans and specifications may be emailed upon request or downloaded from the following link:  

 

https://tpcorp.box.com/s/bbmqxoeba4rapforzlutz3alr7v0wzzz

 

Thompson Builders Corporation is an Equal Opportunity Employer

 Contact:  Kelsey Heaphy 

PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.