is seeking certified and qualified DVBE subcontractors and/or suppliers to provide concrete, electrical, HVAC, paving, plumbing, roofing, steel, casework, flooring, demo, underground, painting, drywall, downspouts, glazing, framing, metal fab, signage, exterior signage, striping, bathroom accessories, fire suppression, etc.
Baker Fire Station - Facility Replacement
2250
Cal. Dept. of Forestry & Fire Protection
14800 Bowman Rd, Cottonwood, CA, 96022
01-14-2026 at 02:00 PM
Paige James
(530) 894-6859
(530) 894-6061
855 Marauder St. Ste 100, Chico, CA, 95973
PROJECT DETAILS:
The work, in general, to be done under this contract of demolition of the existing fire station and construction of a standard 3-Bay fire station:
2-engine, 3-bay fire station (R-2/B/S-2 occupancies), generator/pump building (F1 occupancy), storage building (S-2 occupancy), carport (u
occupancy), trash enclosure, above ground fuel vault on-site improvements include grading, pavement, utilities, septic system, LPG tank,
drainage, site curb/gutter/sidewalks, site lighting, site fencing, hose wash rack, hydrants, flagpole, facility sign, landscaping, and irrigation.
Demolition work includes removal of existing structures, hose rack, tanks, poles, towers, signs, a/c, paving, concrete, sidewalks, curbs, trees
and related utilities.
*All RFI's must be submitted to Ryan Beck ( ryan.beck@fire.ca.gov )
*DVBE participation is required (Mandatory 3%).
*All subcontractors must have a active DIR # in order to submit a bid on this project.
*CARB - Fleet Vehicles
*Highest Prevailing wage per DIR Locally.