is seeking certified and qualified DVBE subcontractors and/or suppliers to provide DIVISION 02 EXISTING CONDITIONS 02 41 19 Selective Demolition for Remodeling DIVISION 03 CONCRETE 03 10 00 Concrete Forming & Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete DIVISION 05 METALS 05 50 00 Metal Fabrications DIVISION 06 WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry 06 20 00 Finish Carpentry 06 41 00 Custom Casework DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 26 00 Vapor Emission Testing & Control Systems 07 90 00 Joint Sealers DIVISION 08 OPENINGS 08 11 00 Metal Doors & Frames 08 14 00 Flush Wood Doors 08 50 00 Sliding Transaction Windows 08 7100 Finish Hardware 08 80 00 Glazing DIVISION 09 FINISHES 09 21 16 Gypsum Board Assemblies 09 53 00 Suspended Acoustical Ceilings 09 65 00 Resilient Flooring & Base 09 68 00 Carpeting 09 70 00 Cleaning of Vinyl Wall Covering 09 72 00 Wallcovering 09 90 00 Painting10 11 66 Visual Display Surfaces DIVISION 10 SPECIALTIES 10 11 66 Visual Display Surfaces 10 14 00 Signage 10 26 13 Wall Protection 10 44 16 Fire Extinguishers 10 51 13 Metal Lockers DIVISION 26 ELECTRICAL 26 00 00 Electrical Work General Requirements 26 05 05 Selective Demolition for Electrical 26 05 19 Low-Voltage Electrical Power Conductors & Cables 26 05 26 Grounding & Bonding for Electrical Systems 26 05 29 Hangers & Supports for Electrical Systems 26 05 33 Raceway & Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 83 Wiring Connections 26 09 23 Lighting Control Devices 26 27 26 Wiring Devices 26 51 00 Interior Lighting DIVISION 27 COMMUNICATIONS SYSTEMS 27 00 00 Communications DIVISION 28 ELECTRONIC SAFETY & SECURITY 28 46 00 Fire Alarm Systems DIVISION 32 EXTERIOR IMPORVEMENTS 32 31 19 Decorative Metal Fencing & Gates
Florin High School Phase 2
N/A
Elk Grove Unified School District
7956 Cottonwood Ln, Sacramento, CA, 95828
02-04-2026 at 02:00 PM
Harlee Levin
209-838-7388
209-838-3960
1804 Jackson Ave, Escalon, CA, 95320
PROJECT DETAILS:
DESCRIPTION: Lease Leaseback Project. Seeking Sub Bids Only. This is Phase 2 to the Phase 1
Classroom Upgrades Project previously completed in Summer of 2025. There are two components to this
Project:
1) Florin HS Phase 2 Classroom Upgrades (Non-DSA):
· Carpet/base and resilient flooring/base replacement
· Wall damage and vinyl wall covering repair
· Wall, door, frame and ceiling painting
· Ceiling tile replacement
· Minor casework repairs and tune-up
2) Florin HS Phase 2 Administration & Student Services Office Upgrades (DSA):
· Lockers replacement at Building A
· Conversion of work rooms to reception area, windows to access doors at Buildings C & D
· Modifications to power, lighting, & fire alarm, finish upgrades, and modifications to front entry
ornamental iron gates and fencing at Buildings C & D
· Creation of a separate public lobby and physical barrier to the administration office and conversion of
the existing exterior transaction window to an access door onto the inner campus at Building D
Engineers Estimate: $4.5 M
Pre-bid Job walk: Wednesday, January 21, 2026 at 2:00 PM
Location: Florin High School 7956 Cottonwood Lane, Sacramento, CA 95828
Warranty Period: This project has a 2-year warranty period.
Bid Proposal Submission: Bid Proposals are to be emailed to estimator@ctbrayton.com or faxed to (209) 838-3960. Bid Proposals emailed elsewhere may not be received in time for submission.
MEP Prequalification in compliance with Public Contract Code section 20111.6 is required for this Project.
Therefore, mechanical, electrical, and plumbing (“MEP”) subcontractors (as defined by Public Contract Code section 20111.6(k)) must be prequalified by the District prior to the LLB Entity submitting its Proposal. MEP subcontractors subject to these requirements are those with any of the following license classifications: C-4, C-7,C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46. MEP Subcontractors are encouraged to complete the prequalification process as soon as possible to expedite evaluation. The prequalification information is located on the Elk Grove Unified School Districts website. http://www.egusd.net/about/divisions departments/businessservices-And-facilities/facilities-and-planning/
Plans and Specs can be reviewed on our Website at www.ctbrayton.com under “Bidding”.
All Bidders must review insurance requirements and include any additional costs in their cost
Proposals.
PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER AND CONFIRM YOU CAN MEET AB-566 /SB-693 SKILLED AND TRAINED WORKFORCE REQUIREMENTS WHEN SUBMITTING BID.
DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.
a. All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and
b. Prospective subcontractors may only solicit sub-bids from and contract lower-tier subcontractors who are DIR registered contractors.
AB-566 / SB-693 Skilled and Trained Workforce Requirements:
All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding on the project.
Subcontracts will be awarded by the “Best Value Subcontractor Selection” process.
All responsive bidders will be scored according to the following format.
Best Value Subcontractor Selection: The following items will be graded on a point
basis as indicated. Higher scores indicate a higher level of compliance in the opinion of
the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton
& Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’
and awarded a Subcontract accordingly.
• 15 Points Price
• 10 Points Similar Projects (Includes experience with Architect, Owner, GC)
• 8 Points Demonstrated ability to meet the Insurance Requirement (COI) and Safety
• 7 Points Bonding Capacity
• 5 Points Local Business Participation
• 5 Points Manpower / Capacity to perform / “Skilled and Trained” workforce compliance
50 Points Maximum Possible Score per Scorer.
All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master
Agreement for Northern California shall be performed by Union Carpenters.
This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.
All subcontractors must be bondable.
Premiums will be paid by C.T. Brayton & Sons, Inc.
EQUAL OPPORTUNITY EMPLOYER
PDF ATTACHMENTS: