Kemp Bros. Construction, Inc.

is seeking certified and qualified DVBE, MBE and SBE subcontractors and/or suppliers to provide Building Demolition and Site Demolition, Rebar, Cast-in-Place Structural Concrete, Masonry, Structural Steel, Metal Decking, Miscellaneous Metals, Waterproofing, Roofing, Flashing and Sheet Metal, Joint Sealants, Painting, Signage, Flagpoles, Kitchen Equipment, Fire Sprinklers, Electrical, Photovoltaic Systems, Communications and Audio Visual, Fire Alarm System, Earthwork, Asphalt and Striping, Fences and Gates, Landscaping and Irrigation, Site Concrete, and Site Utilities


PROJECT NAME:

Franklin Elementary School MPR, Kitchen, & Admin Building Replacement Project

BID CONTRACT #:

01-25/26

AWARDING AGENCY:

Pasadena Unified School District

PROJECT LOCATION:

527 West Ventura Street, Altadena, CA, 91001

BID DUE DATE:

01-27-2026 at 02:00 PM

OUTREACH COORDINATOR:

struong@kempbros.com

TELEPHONE:

562-236-5000

FAX:

562-236-5010

ADDRESS:

10135 Geary Avenue, Santa Fe Springs, CA, 90670

PROJECT DETAILS:

Project Scope of Work

This project comprises of the complete replacement of the existing Multi-Purpose Room (MPR) and Administration Buildings at Franklin Elementary School that were damaged in the Eaton Fire. The rebuild is needed to return the campus to operational use, scheduled for Summer 2026. The work includes, but is not limited to, the following major components:

• Demolition of the existing fire-damaged structures and associated site elements in preparation for new construction

• Site grading

• Construction of new foundations for the new two (2) Silver Creek modular buildings: MPR and Administration Building

• Construction of a new lunch shelter

• Construction of new covered walkways

• Kitchen Equipment

• New utility connections, including power, water, sewer, communications, and all required service  infrastructure to support building operations

• All related sitework to safely reopen the school, including paving, hardscape, landscape, fences & gates, and campus circulation improvements

• ADA pathway of travel connecting the campus to the school’s new designated Safe Dispersal Area