Trade Journal

Zovich & Sons Inc

is seeking certified and qualified City of San Francisco LBE subcontractors and/or suppliers to provide demo, concrete, rebar, masonry, metal deck, misc steel, rough carpentry, casework, insulation, water repellants, roofing, sheet metal, joint sealants, efis, doors/frames/hardware, windows, gyp board, flooring, tile, painting, signage, wall protection, fire protection, window shaces, elevators, plumbing, hvac, electrical, micropiles, excavation, pavement markings


PROJECT NAME:

CHINATOWN BRANCH LIBRARY RENOVATION

BID CONTRACT #:

0000011171

AWARDING AGENCY:

CITY & COUNTY OF SAN FRANCISCO SAN FRANCISCO PUBLIC WORKS

PROJECT LOCATION:

1135 Powell Street, SAN FRANCISCO, CA, 94120

BID DUE DATE:

02-18-2026 at 01:30 PM

OUTREACH COORDINATOR:

Tammy Enos

TELEPHONE:

(925) 775-4227

FAX:

(925) 238-0428

ADDRESS:

103 Technology Court, Suite A, Brentwood, CA, 94513

PROJECT DETAILS:

We are accepting proposals from all trades/suppliers for work associated with Divisions 02 thru 32. Project consists of: complete renovation of the Chinatown Him Mark Lai Branch Library at
1135 Powell Street, San Francisco. The building was built in 1921 and is a San Francisco registered
historic landmark. The building underwent significant renovation and addition in 1995 to add a large rear
yard addition, seismic strengthening and accessibility upgrades including two elevators. The structural
retrofit resulted in the diminishment of the landmarked Main Reading Room. This project will renew the
historic grandeur of the Main Reading Room through removal of the prior retrofit in addition to complete
building renovation. The scope includes selective demolition, new architectural finishes, sitework, utilities,
structural updates, mechanical, plumbing, electrical, fire protection, telecommunication, security, elevator,
and audiovisual systems. Building exterior improvements include façade repair, historic façade
restoration, roofing, and a new roof terrace. The project requires USGBC LEED Gold certification.
The time allowed for completion is 730 consecutive calendar days. The estimated construction cost is
approximately $21,200,000. For more information, contact the Project Manager Masoud Vafaei by
phone: 271-2933 or email: Masoud.Vafaei@sfdpw.org.
This is a PLA project.

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available:

  1. Local Builders Exchanges
  2. Requesting link from admin@zovichconstruction.com

 Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company.

We are accepting sub/supplier pricing from all divisions 02 thru 32 listed in the contract specifications.  

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.