Erickson-Hall Construction Co

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, MUSIC BUILDING and FIRE ALARM REPLACEMENT. The scope includes construction a 2-story 30,181 SF classroom / administration building, Modernization of existing music building, fire alarm upgrades, and associated site improvements, including but not limited to site demolition, select interior demolition, grading, site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acoustical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage. Job Walk - 04/28/22 - 10am @ main parking lot, Interior walk 04/28/22 @ 3:30pm Budget $32,000,000.00 All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall (760) 769-7700


PROJECT NAME:

Magnolia HS Center of Excellence

BID CONTRACT #:

C-32185

AWARDING AGENCY:

Erickson-Hall Construction Co.

PROJECT LOCATION:

2450 W. Ball Road, Anaheim, CA, 92804

BID DUE DATE:

05-10-2022 at 02:00 PM

OUTREACH COORDINATOR:

Laura Cullifer

TELEPHONE:

7607967700

FAX:

7607967750

ADDRESS:

500 Corporate Drive, Escondido, CA, 92029

PROJECT DETAILS:

ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, MUSIC BUILDING and FIRE ALARM REPLACEMENT.
The scope includes construction a 2-story  30,181 SF classroom / administration building, Modernization of existing music building, fire alarm upgrades, and associated site improvements,  including but not limited to site demolition, select interior demolition, grading,  site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acoustical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage.

Job Walk - 04/28/22 - 10am @ main parking lot, Interior walk 04/28/22 @ 3:30pm

Budget $32,000,000.00

All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements

Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license.
Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall  (760) 769-7700

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.