is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, MUSIC BUILDING and FIRE ALARM REPLACEMENT. The scope includes construction a 2-story 30,181 SF classroom / administration building, Modernization of existing music building, fire alarm upgrades, and associated site improvements, including but not limited to site demolition, select interior demolition, grading, site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acoustical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage. Job Walk - 04/28/22 - 10am @ main parking lot, Interior walk 04/28/22 @ 3:30pm Budget $32,000,000.00 All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall (760) 769-7700
Magnolia HS Center of Excellence
C-32185
Erickson-Hall Construction Co.
2450 W. Ball Road, Anaheim, CA, 92804
05-10-2022 at 02:00 PM
Laura Cullifer
7607967700
7607967750
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE 31,000 SF MAGNOLIA HS CENTER OF EXCELLENCE BUILDING, MUSIC BUILDING and FIRE ALARM REPLACEMENT.
The scope includes construction a 2-story 30,181 SF classroom / administration building, Modernization of existing music building, fire alarm upgrades, and associated site improvements, including but not limited to site demolition, select interior demolition, grading, site utilities, asphalt paving, site furnishings, fencing, site concrete, landscaping, structural concrete, masonry, structural steel, metal deck, casework, insulation, waterproofing, sheet metal, ACM wall panels, PVC roofing, D/F/H, glass / glazing, curtain walls, plaster, EFIS, framing, drywall, ceramic tile, acoustical ceiling, acoustical wall treatment, flooring, access flooring, paint, marker / tackboards, restroom accessories, high density storage, elevator, plumbing, HVAC, electrical, low voltage.
Job Walk - 04/28/22 - 10am @ main parking lot, Interior walk 04/28/22 @ 3:30pm
Budget $32,000,000.00
All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements
Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license.
Prequalification materials are available on the project website or by contacting Summer Lupkin or Vipin Shaji at Erickson-Hall (760) 769-7700