Trade Journal

ProWest Constructors

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide SWPPP Monitoring, SWPPP Implementation, Final Clean, surveying, demolition, hazardous material handling, reinforcing steel, structural steel, handrails and railings, rough carpentry, finish carpentry, cabinets and millwork, waterproofing, insulation, roofing, sheet metal flashing and trim, doors frames and hardware, drywall and metals studs, lath and plaster, ceramic tile, painting, signage, toilet partitions and bathroom accessories, flagpoles, athletic equipment, scoreboards, playground surfacing, site furnishings, grandstands and bleacher seating, manufactured press box, HVAC, communications, intercom systems, audio visual, fire alarm system, intrusion detection, ac paving, fences and gates, athletic tracks and fields, landscaping and irrigation, site utilities,


PROJECT NAME:

LAUSD - Gardena High School Stadium Upgrades

BID CONTRACT #:

10373385/231614

AWARDING AGENCY:

Los Angeles Unified School District

PROJECT LOCATION:

1301 W. 182nd Street, Gardena, CA, 90248

BID DUE DATE:

03-04-2026 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

This project consists of a full modernization of the Gardena High School football stadium and track facilities, offering a broad range of scopes. The work includes demolition of the existing ticket booth, bleachers, soccer/football field including the existing track and field area and related site features, verification of the existing topographic survey, and construction of a new synthetic eight-lane all-weather track. New field event areas for long jump, triple jump, and high jump will be constructed, along with upgrades to the existing shot-put area. The project also includes a new regulation-size natural grass football/soccer field with complete irrigation and drainage systems, new home and visitor grandstands accommodating approximately 3,600 and 1,900 seats, a new press box, sound system, scoreboard, football goal posts, and new perimeter fencing and gates.


 

In addition to the athletic facilities, the project includes substantial site, utility, and building upgrades. Scopes include temporary staff parking early in the project, mass grading and earthwork, asphalt paving, concrete flatwork, hardscape and landscape improvements, storm drainage, and utility infrastructure upgrades. Interior and exterior renovations will be performed at the existing home and visitor restroom and concession buildings, along with ADA accessibility improvements throughout the stadium, adjacent gym buildings, and associated paths of travel. The project will also include new mechanical, electrical, and plumbing systems.


 

Estimated Cost: $25,860,000

Project Duration: 25 Months (760 Calendar Days)

Liquidated Damages: $3,000/Day

Prevailing wage rates apply to this project

Bids must remain valid for a minimum of 60 days

Disabled Veteran Business Enterprise (DVBE) participation goal: 3%

Small Business Enterprise (SBE) participation goal: 25%

Compliance with Skilled and Trained Workforce requirements is mandatory

Project is governed by a Project Stabilization Agreement (PSA)

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.