Trade Journal

Cen-Cal Construction

is seeking certified and qualified HUD Section 3 subcontractors and/or suppliers to provide Mobilization, Demobilization, Traffic Control, Dust Control, SWPPP, Storm Water Pollution Plan, Construction Signs, Clearing, Grubbing, Demolition, Concrete Removal, Grinding, Excavation, Small Concrete, Curb Ramps, Minor Concrete, Sidewalk, Drive Approaches, Concrete Driveways, Curb and Gutter, Retaining Curb, Asphalt Concrete Dike, Aggregate Base Class II, Hot Mix Asphalt, Resent Monuments, Cover to Grade, Signage, Pavement Striping, Markers and markings, Repair Landscape, Irrigation, Kind Landscape Bark, Traffic Signals, Lighting and Video Detection Systems, Water Pipe, Water Service, Backflow Preventer Relocation, Water Monitoring System, Install Fire Hydrant, Remove Dry well, Storm Drain Inlet, Storm Drain Manhole, Sewer Service, Sewer Pipe, Storm Drain Pipe, Open Bottom Catch Basin, Concrete Suppliers, Asphalt Suppliers, Traffic Light Electrical Suppliers


PROJECT NAME:

Prosperity and West Traffic Signal and Improvements

BID CONTRACT #:

EN0088

AWARDING AGENCY:

City of Tulare

PROJECT LOCATION:

W. Prosperity Ave & N. West Street, Tulare, CA, 93274

BID DUE DATE:

03-12-2026 at 01:30 PM

OUTREACH COORDINATOR:

Jason Plank

TELEPHONE:

661-399-3759

FAX:

661-399-3812

ADDRESS:

31207 Denbeste Ct , Shafter, CA, 93263

PROJECT DETAILS:

PO BOX 81737

BAKERSFIELD, CA 93380

OFFICE: (661) 399-3759

FAX: (661) 399-3812

 

 

 

 

Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified Section 3 Contractors or Suppliers.  Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:

Prosperity and West Traffic Signal and Improvements

To be located in the City of Tulare and funded in whole or part by Federal Funds.

Bid Date: March 12, 2026 @ 1:30 PM

Interested Section 3 firms may contact Jason Plank at (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on March 11, 2026.

* 03/11/2026- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid*


Bid documents can be obtained from:

QK Visalia Office located at 901 East Main Street, Visalia, CA 93292, www.tulare.ca.gov, or https:\\planroom.qkinc.com.

 

*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *

 

We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to possess current contractors license as well as current Liability, Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage Section 3 Certified Contractors to contact Cen-Cal Construction to learn what assistance we can provide to you, such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.

Subcontractor and Supplier bids are required by 5:00 PM March 11, 2026.

 

Bids for the followings Items are being accepted:


 

 

Item 1-Mobilization, Demobilization, Bonds, & Insurance         Item 19- Concrete Driveway 6”

Item 2-Traffic Control Systems                                                  Item 20-Concrete Curb & Gutter (Type A Depressed Curb)

Item 3-Dust Control                                                                  Item 21-Concete Roll-Type Curb

& Gutter

Item 4-SWPPP                                                                        Item 22-Concrete Retaining Curb 8”

Item 5-Construction Notification Sign                                     Item 23-Asphalt Concrete Dike

Item 6-Clearing, Grubbing, & Demolition                               Item 24-Driveway Tie-ins, Completions w/Decomposed Granite

Item 7-Miscellaneous Facilities & Operations                        Item 25-Aggregate Base (Class II)

Item 8-Unknown Utility Conflict                                             Item 26-Hot Mix Asphalt

Item 9- Concrete Removal (Curb &Gutter)                            Item 27-Reset Monument & Adjust Frame & Cover to Grade

Item 10-Concrete Removal (Driveway Approach)                 Item 28-Signage, Pavement Striping, Markers & Markings

Item 11-Concrete Removal (Curb Ramp)                              Item 29-Repair Landscape & Irrigation in Kind+ Landscape Bark                

Item 12-Concrete Removal (4” Sidewalk)                              Item 30-New Traffic Signal, Lighting & Video Detection System

Item 13-Grind & Remove Existing Asphalt Concrete             Item 31-Remove Existing Valve Risers, Boxes & Lids

Item 14-Roadway Excavation & Subgrade Prep                    Item 32-Abandon Existing Water Lines

Item 15-Concrete Curb Ramps (Dual-Style)                            Item 33-12” C-900 DR-18 Water Pipe

Item 16-Concrete Curb Ramos (Single Style)                          Item 34-12” C-900 DR-14 water Pipe

Item 17-Concrete Sidewalk 4”                                                  Item 35-1” Water Service & Meter

Item 18-Residential Driveway Approach                                    Item 36-1” Water Service & Meter + Backflow Preventer


 

Item 37-1 ½” Water Service & Meter

Item 38-2” Water & Service

Item 39-Water Monitoring System

Item 40-Water Blowoff Assembly

Item 41- Install Fire Hydrant Assembly

Item 42-Ajust Water Valve to Grade

Item 43-Remove Existing Dry Well & Grate

Item 44-Storm Drain Inlet

Item 45-60” Storm Drain Manhole

Item 46-12” SDR-26 Storm Drainpipe

Item 47-18” SDR-26 Strom Drainpipe

Item 48-24” RGRCP Storm Drainpipe

Item 49-24” Brick and Mortar Pipe

Item 50-TID 36” Class 2000-D RGRCP

Item 51-Remove/Replace TID J Boxes

Item 52-TID Canal Configuration & Surface

Item 53-18” SDR-26 PVC Sewer Pipe

Item 54-4” Sewer Service

Item 55-6” Sewer Service

Item 56-48” Sanitary Sewer Manhole

Item 57-Adjust Sanitary Sewer Manhole to Grade

Item 58-Furnish & Install Open-Bottom Catch Basin

 

 



 

 


 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.