is seeking certified and qualified HUD Section 3 subcontractors and/or suppliers to provide Mobilization, Demobilization, Traffic Control, Dust Control, SWPPP, Storm Water Pollution Plan, Construction Signs, Clearing, Grubbing, Demolition, Concrete Removal, Grinding, Excavation, Small Concrete, Curb Ramps, Minor Concrete, Sidewalk, Drive Approaches, Concrete Driveways, Curb and Gutter, Retaining Curb, Asphalt Concrete Dike, Aggregate Base Class II, Hot Mix Asphalt, Resent Monuments, Cover to Grade, Signage, Pavement Striping, Markers and markings, Repair Landscape, Irrigation, Kind Landscape Bark, Traffic Signals, Lighting and Video Detection Systems, Water Pipe, Water Service, Backflow Preventer Relocation, Water Monitoring System, Install Fire Hydrant, Remove Dry well, Storm Drain Inlet, Storm Drain Manhole, Sewer Service, Sewer Pipe, Storm Drain Pipe, Open Bottom Catch Basin, Concrete Suppliers, Asphalt Suppliers, Traffic Light Electrical Suppliers
Prosperity and West Traffic Signal and Improvements
EN0088
City of Tulare
W. Prosperity Ave & N. West Street, Tulare, CA, 93274
03-12-2026 at 01:30 PM
Jason Plank
661-399-3759
661-399-3812
31207 Denbeste Ct , Shafter, CA, 93263
PROJECT DETAILS:

PO BOX 81737
BAKERSFIELD, CA 93380
OFFICE: (661) 399-3759
FAX: (661) 399-3812
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified Section 3 Contractors or Suppliers. Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
Prosperity and West Traffic Signal and Improvements
To be located in the City of Tulare and funded in whole or part by Federal Funds.
Bid Date: March 12, 2026 @ 1:30 PM
Interested Section 3 firms may contact Jason Plank at (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on March 11, 2026.
* 03/11/2026- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid*
Bid documents can be obtained from:
QK Visalia Office located at 901 East Main Street, Visalia, CA 93292, www.tulare.ca.gov, or https:\\planroom.qkinc.com.
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to possess current contractors license as well as current Liability, Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage Section 3 Certified Contractors to contact Cen-Cal Construction to learn what assistance we can provide to you, such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.
Subcontractor and Supplier bids are required by 5:00 PM March 11, 2026.
Bids for the followings Items are being accepted:
Item 1-Mobilization, Demobilization, Bonds, & Insurance Item 19- Concrete Driveway 6”
Item 2-Traffic Control Systems Item 20-Concrete Curb & Gutter (Type A Depressed Curb)
Item 3-Dust Control Item 21-Concete Roll-Type Curb
& Gutter
Item 4-SWPPP Item 22-Concrete Retaining Curb 8”
Item 5-Construction Notification Sign Item 23-Asphalt Concrete Dike
Item 6-Clearing, Grubbing, & Demolition Item 24-Driveway Tie-ins, Completions w/Decomposed Granite
Item 7-Miscellaneous Facilities & Operations Item 25-Aggregate Base (Class II)
Item 8-Unknown Utility Conflict Item 26-Hot Mix Asphalt
Item 9- Concrete Removal (Curb &Gutter) Item 27-Reset Monument & Adjust Frame & Cover to Grade
Item 10-Concrete Removal (Driveway Approach) Item 28-Signage, Pavement Striping, Markers & Markings
Item 11-Concrete Removal (Curb Ramp) Item 29-Repair Landscape & Irrigation in Kind+ Landscape Bark
Item 12-Concrete Removal (4” Sidewalk) Item 30-New Traffic Signal, Lighting & Video Detection System
Item 13-Grind & Remove Existing Asphalt Concrete Item 31-Remove Existing Valve Risers, Boxes & Lids
Item 14-Roadway Excavation & Subgrade Prep Item 32-Abandon Existing Water Lines
Item 15-Concrete Curb Ramps (Dual-Style) Item 33-12” C-900 DR-18 Water Pipe
Item 16-Concrete Curb Ramos (Single Style) Item 34-12” C-900 DR-14 water Pipe
Item 17-Concrete Sidewalk 4” Item 35-1” Water Service & Meter
Item 18-Residential Driveway Approach Item 36-1” Water Service & Meter + Backflow Preventer
Item 37-1 ½” Water Service & Meter
Item 38-2” Water & Service
Item 39-Water Monitoring System
Item 40-Water Blowoff Assembly
Item 41- Install Fire Hydrant Assembly
Item 42-Ajust Water Valve to Grade
Item 43-Remove Existing Dry Well & Grate
Item 44-Storm Drain Inlet
Item 45-60” Storm Drain Manhole
Item 46-12” SDR-26 Storm Drainpipe
Item 47-18” SDR-26 Strom Drainpipe
Item 48-24” RGRCP Storm Drainpipe
Item 49-24” Brick and Mortar Pipe
Item 50-TID 36” Class 2000-D RGRCP
Item 51-Remove/Replace TID J Boxes
Item 52-TID Canal Configuration & Surface
Item 53-18” SDR-26 PVC Sewer Pipe
Item 54-4” Sewer Service
Item 55-6” Sewer Service
Item 56-48” Sanitary Sewer Manhole
Item 57-Adjust Sanitary Sewer Manhole to Grade
Item 58-Furnish & Install Open-Bottom Catch Basin

PDF ATTACHMENTS: