Trade Journal

Edwards Construction Group

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Site Demolition, Concrete, Rebar, Structural Steel, Metal Framing, Steel Decking, Metal Fabrications, Pipe & Railings, Rough Carpentry, FRP (Fiberglass Reinforced Paneling), ,Bird Control Netting, Casework and Countertops, Sheet Metal Flashing and Trim, Expansion Joints, Thermal Insulation, Waterproofing, Roofing, Roof Accessories, Doors, Frames, Hardware, Aluminum Storefronts, Skylights, Glazing, Access Doors and Frames, Gypsum Board, Cement Plaster, Ceramic Tiling, Acoustical Walls & Ceilings, Flooring, Painting & Coatings, Resilient Base and Accessories, Visual Display Units, Toilet, Bath, and Laundry Accessories, Plastic-Laminate-Clad Lockers, Lockers, Facility Fall Protection, Window Shades, Shade Structures, Plumbing, HVAC, Testing, Adjusting, and Balancing for HVAC, DDC for HVAC, Electrical, Communications Safety and Security, Earthwork, Asphalt Paving, Pavement Markings & Accessories, Site Concrete Paving, Fencing, Synthetic Turf, Landscape, Site Utilities


PROJECT NAME:

Rancho Del Rey Middle School Building & Site Rehabilitation

BID CONTRACT #:

BID 26-2977-BI

AWARDING AGENCY:

Sweetwater Union High School District

PROJECT LOCATION:

1174 East J Street, Chula Vista, CA, 91910

BID DUE DATE:

04-14-2026 at 02:00 PM

OUTREACH COORDINATOR:

Jack Latterell

TELEPHONE:

619-784-2704

FAX:

805-614-9909

ADDRESS:

4350 EXECUTIVE DRIVE, SUITE 205, SAN DIEGO, CA, 92121

PROJECT DETAILS:

Project Description

Edwards Construction Group is currently pursuing the Rancho Del Rey Middle School Building & Site Rehabilitation for Sweetwater Union High School District. 

 

SCOPE OF WORK

The rehabilitation and alteration of the existing campus buildings, infrastructure and site. Existing campus buildings scope includes flooring, interior paint, acoustic ceilings, acoustic paneling, room signage, window replacement, window coverings, door hardware, security window film, casework, roof ladders, framing, drywall, electrical, plumbing, tile, stucco, exterior paint, skylights, HVAC, roof hatches, insulation, HAZMAT remediation, standing seam and PCV roofing. Infrastructure and site work includes fire alarms, Telecore communication systems, high voltage electric system modifications, drinking fountains, way finding signage, decorative fencing, storm drains, grading, A/C and concrete paving, concrete ramp and stair replacement, concrete resurfacing, landscaping, irrigation, lighting, shade structures, painting, and a new marquee

 

There is a PROJECT LABOR AGREEMENT.

https://facilities.sweetwaterschools.org/project-labor-agreement

 

This is a PREVAILING WAGE project.  

 

There is a 3% DVBE Participation requirement.

 

Subcontractor Prequalification is required - submission deadline is March 27, 2026 at 2:00p.m.- https://purchasing.sweetwaterschools.org/contractor-pre-qualification

Any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered,” ANY listed subcontractor holding one of those licenses stated in Public Contract Code section 20111.6(k) must be prequalified for this project regardless of the scope of work assigned to that subcontractor.

 

 

BID DATE -  April 14, 2026 at 9:00 a.m.

Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 1 hour before the time the bid is due to be considered. 

 

 

Please call or email if you have any questions.

 

Thank you,

 

 

Estimating

Office: 619-784-2704

E-mail: estimatingsd@weareedwards.com 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.