is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide SWPPP MONITORING, SWPPP IMPLEMENTATION, FINAL CLEANING, SURVEYING, DEMOLITION, HAZARDOUS MATERIAL HANDLING, REINFORCING STEEL, CIP CONCRETE, MASONRY, STRUCTURAL STEEL, METAL DECK, WATERPROOFING, INSULATION, ROOFING, SHEET METAL FLASHING AND TRIM, DOOR HARDWARE, DRYWALL AND METAL STUDS, PAINTING, SIGNAGE, FIRE EXTINGUISHERS AND CABINETS, ATHLETIC EQUIPMENT, SCOREBOARDS, PRE-FAB BUILDINGS, GRANDSTANDS AND BLEACHER SEATING, MANUFACTURED PRESS BOX, EARTHWORK, AC PAVING, SITE CONCRETE, FENCES AND GATES, ATHLETIC TRACKS AND FIELD, LANDSCAPING AND IRRIGATION
LAUSD - Susan Miller Dorsey Senior High School Stadium Upgrades Natural Turf Field & Synthetic Track
10373388
Los Angeles Unified School District
3537 Farmdale Avenue, Los Angeles, CA, 90016
05-01-2026 at 02:00 PM
Alicia Daniel
9516781038
9516781083
22710 Palomar Street, Wildomar, CA, 92595
PROJECT DETAILS:
PROJECT DESCRIPTION:
This project consists of major stadium upgrades at Susan Miller Dorsey Senior High School, providing a broad range of bid opportunities across multiple trades. The scope includes construction of a new natural turf football/soccer field, synthetic running track, and field event facilities, along with new home and visitor grandstands with press box and modular restroom buildings. Additional work includes installation of LED sports lighting, scoreboards, public address systems, fire alarm systems, and supporting electrical and low-voltage infrastructure. Environmental scope includes hazardous material abatement and stormwater management systems.
The project also includes significant site and infrastructure improvements, including grading, paving, ADA-compliant paths of travel, fencing, irrigation, landscaping, and off-site street and sidewalk upgrades. Utility work includes water, sewer, storm drainage, and electrical distribution systems. The project consists of multiple packages spanning civil, structural, architectural, MEP, and specialty scopes, and will be constructed on an active campus under LAUSD and DSA requirements.
Estimated Cost: $13,000,000
Project Duration: 26 Months (780 Calendar Days)
Liquidated Damages: $1,500/Day
Prevailing wage rates apply to this project
Bids must remain valid for a minimum of 60 days
Disabled Veteran Business Enterprise (DVBE) participation goal: 3%
Small Business Enterprise (SBE) participation goal: 25%
Compliance with Skilled and Trained Workforce requirements is mandatory
Project is governed by a Project Stabilization Agreement (PSA)
All subcontractors, including DVBE subcontractors, shall be prepared to provide payment and performance bonds equal to 100% of their subcontract value. ProWest will pay bond premiums up to 1.5%. Please provide your bond rate with your proposal. ProWest reserves the right to require Financial Statements for evaluation and consideration when awarding work to any Subcontractor.
ProWest's listing of a subcontractor does not imply acceptance of any conditions, qualifications, or exceptions stated in the subcontractor's bid proposal. The subcontractor agrees that their bid will remain valid for the same duration as ProWest's bid must remain valid with the project owner plus a reasonable time for the issuance of a Notice of Intent to Award, Notice to Proceed, or Subcontract. Each listed subcontractor must sign ProWest's standard Subcontract Agreement if ProWest is awarded the project. The Subcontract Agreement is available for review on ProWest's website at www.goprowest.com.
If the project is subject to a Project Labor Agreement, Project Stabilization Agreement, Community Workforce Agreement, or Skilled and Trained Worker compliance, the subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements or programs and further agrees to adhere to all of the requirements therein as provided in all the bid documents, including the General Conditions and Supplemental Conditions.