is seeking certified and qualified City of San Diego SLBE/ELBE subcontractors and/or suppliers to provide SWPPP, Fence and Gates, Signage, Surveying, Earthwork, Grading, Excavation, Site Utilities, Landscaping, Irrigation, Structural Concrete, Site Concrete, Rebar, Tree Protection, Tree Removal, Stormwater Diversion, Dewatering, Demolition, Clearing and Grubbing, Pest Control, Abatement, Bentonite Clay Liner, River Cobble, Sediment Basin, Concrete Weirm Spillway, Gabion Baskets, Aeration System, Fish Habitat Structures, Storm Drains, Underdrains, CMP Storm Drainpipe, Culvert Extension, Timber Bridge, Paint, Pier, Gangway, Paving, Bird Blind Structure, Flexmat Blocks, Embankment Fill, Electrical, Plumbing, Lakebed and Embankment Repair, Site Furnishings, Shade Structures, Slurry Seal, Striping,
Lindo Lake Improvements Phase II
13078
County of San Diego
12660 Lindo Lake Lane, Lakeside, CA, 92040
04-10-2026 at 02:00 PM
Jessica Gregory
805-335-1161
805-614-9909
991 Bennett Avenue, Arroyo Grande, CA, 93420
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the Lindo Lake Improvements Phase II project with the County of San Diego.
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
Small-Local Business Subcontractor Participation Requirements
Vehicle Emissions Disclosure & Compliance Requirement
Skilled & Trained Workforce Requirements
BID DATE - Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 1 hour before the time the bid is due to be considered.