is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, rebar, concrete, structural steel, metal fabrications, bird control devices, cabinets, plastic laminates, rough carpentry, acoustical ceilings, building insulation, joint sealants, metal roofing, roofing, sheet metal, waterproofing, access doors, doors, frames and hardware, hollow metal doors, skylights, storefronts, ceramic tile, metal framing, painting, plaster and drywall, resilient flooring, rubber flooring, lockers, signage, toilet partitions and accessories, visual display board, fall protection, solid surface countertops, window coverings, fabric structures, Plumbing, HVAC, Electrical, Low Voltage, fire alarm, security system, heat exchangers, asphalt, chain link fences and gates, concrete, irrigation, landscape, synthetic fields, site utilities.
Rancho Del Rey Middle School – Building & Site Rehabilitation
26-2977-BI
Sweetwater Union High School District
1174 East J Street, Chula Vista, CA, CA, 91910
04-14-2026 at 02:00 PM
Bree
7605121188
NA
2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010
PROJECT DETAILS:
DSA #: 04-124769
Bid #: 26-2977-BI
Project Estimate: $57M
Project Link: 2-Rancho Del Rey_Plans, Specs and Addendums
Conan Construction is inviting subcontractors to bid the Rancho Del Rey Middle School Building & Site Rehabilitation Project located in Chula Vista, CA.
This project includes campus wide modernization and site improvements at Rancho Del Rey Middle School.
• Repair and upgrade of non compliant paths of travel including accessible ramps, stairs and walkways
• Reconfiguration of student drop off areas along Paseo Ranchero and East J Street including additional accessible drop offs and compliant sidewalks
• Replacement of accessible parking stalls in the East J Street drop off area and staff parking lot east of Building 900
• Connection of new downspouts to existing storm drains
• Concrete resurfacing at the covered pavilion
• Landscape improvements and irrigation system upgrades
• Replacement of site lighting with new LED pole lights
• Installation of shade structures throughout campus
• Replacement of drinking fountains with new ADA compliant fountains and bottle fillers
• New campus wide building and wayfinding signage
• Replacement of campus marquee sign
• Replacement and addition of pedestrian gates
• Painting of exterior covered walkways and canopies
• Removal of temporary portable classroom buildings at end of project
• Replacement of low slope roofing with PVC roofing systems
• Replacement of standing seam metal roofing
• Replacement of roof drains, overflow drains and downspouts
• Replacement of skylights and roof hatches with new safety railing systems
• Exterior painting of all buildings
• Replacement of lower exterior wall systems with cement plaster
• Interior modernization including finishes, ceilings and room signage
• Replacement of window coverings and damaged windows
• Removal of overhead classroom doors and replacement with solid walls
• Replacement of gas HVAC units with electric heat pump systems campus wide
• Installation of security window film
• Replacement of door hardware in select areas
• Replacement of walls damaged by water intrusion as required
• Installation of roof ladders
• Replacement of casework
• Addition of roof insulation to meet Title 24
• ADA upgrades to existing restrooms
• Removal of operable partitions and replacement with solid walls
Important Project Requirements
• Project Labor Agreement (PLA) applies
• Prevailing Wage Project
• DIR Registration required for all contractors and subcontractors
• SUHSD Prequalification required for certain trades
• 3% DVBE participation goal or documented good faith effort required
Rancho Del Rey Middle School
1174 East J Street
Chula Vista, CA
Bid Information:
Bid Due: April 14, 2026 – 2:00 PM
Owner: Sweetwater Union High School District
Plans and specifications are available through the BuildingConnected plan room.
Please submit questions through BuildingConnected or contact Conan Construction estimating.