Conan Construction, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, rebar, concrete, structural steel, metal fabrications, bird control devices, cabinets, plastic laminates, rough carpentry, acoustical ceilings, building insulation, joint sealants, metal roofing, roofing, sheet metal, waterproofing, access doors, doors, frames and hardware, hollow metal doors, skylights, storefronts, ceramic tile, metal framing, painting, plaster and drywall, resilient flooring, rubber flooring, lockers, signage, toilet partitions and accessories, visual display board, fall protection, solid surface countertops, window coverings, fabric structures, Plumbing, HVAC, Electrical, Low Voltage, fire alarm, security system, heat exchangers, asphalt, chain link fences and gates, concrete, irrigation, landscape, synthetic fields, site utilities.


PROJECT NAME:

Rancho Del Rey Middle School – Building & Site Rehabilitation

BID CONTRACT #:

26-2977-BI

AWARDING AGENCY:

Sweetwater Union High School District

PROJECT LOCATION:

1174 East J Street, Chula Vista, CA, CA, 91910

BID DUE DATE:

04-14-2026 at 02:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

7605121188

FAX:

NA

ADDRESS:

2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010

PROJECT DETAILS:

Rancho Del Rey Middle School – Building & Site Rehabilitation

Sweetwater Union High School District

DSA #: 04-124769

Bid #: 26-2977-BI

Project Estimate: $57M

Project Link: 2-Rancho Del Rey_Plans, Specs and Addendums

Conan Construction is inviting subcontractors to bid the Rancho Del Rey Middle School Building & Site Rehabilitation Project located in Chula Vista, CA.

Project Description

This project includes campus wide modernization and site improvements at Rancho Del Rey Middle School.

Campus Site Improvements

• Repair and upgrade of non compliant paths of travel including accessible ramps, stairs and walkways

• Reconfiguration of student drop off areas along Paseo Ranchero and East J Street including additional accessible drop offs and compliant sidewalks

• Replacement of accessible parking stalls in the East J Street drop off area and staff parking lot east of Building 900

• Connection of new downspouts to existing storm drains

• Concrete resurfacing at the covered pavilion

• Landscape improvements and irrigation system upgrades

• Replacement of site lighting with new LED pole lights

• Installation of shade structures throughout campus

• Replacement of drinking fountains with new ADA compliant fountains and bottle fillers

• New campus wide building and wayfinding signage

• Replacement of campus marquee sign

• Replacement and addition of pedestrian gates

• Painting of exterior covered walkways and canopies

• Removal of temporary portable classroom buildings at end of project

 

Building Modernization

• Replacement of low slope roofing with PVC roofing systems

• Replacement of standing seam metal roofing

• Replacement of roof drains, overflow drains and downspouts

• Replacement of skylights and roof hatches with new safety railing systems

• Exterior painting of all buildings

• Replacement of lower exterior wall systems with cement plaster

• Interior modernization including finishes, ceilings and room signage

• Replacement of window coverings and damaged windows

• Removal of overhead classroom doors and replacement with solid walls

• Replacement of gas HVAC units with electric heat pump systems campus wide

• Installation of security window film

• Replacement of door hardware in select areas

• Replacement of walls damaged by water intrusion as required

• Installation of roof ladders

• Replacement of casework

• Addition of roof insulation to meet Title 24

• ADA upgrades to existing restrooms

• Removal of operable partitions and replacement with solid walls

Important Project Requirements

• Project Labor Agreement (PLA) applies

• Prevailing Wage Project

• DIR Registration required for all contractors and subcontractors

• SUHSD Prequalification required for certain trades

• 3% DVBE participation goal or documented good faith effort required

Location:

Rancho Del Rey Middle School

1174 East J Street

Chula Vista, CA

Bid Information: 

Bid Due: April 14, 2026 – 2:00 PM

Owner: Sweetwater Union High School District

Documents

Plans and specifications are available through the BuildingConnected plan room.

Contact

Please submit questions through BuildingConnected or contact Conan Construction estimating.