is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition Structural demolition Selective demolition Removal and disposal of asbestos containing materials Removal and disposal of material containing lead Removal and disposal of universal waste and pcb Cast in place concrete Concrete Reinforcing Concrete unit masonry Metal Fabrications Structural Steel Framing Rough Carpentry Sheathing Glued Laminated Construction Plastic Laminated clad architectural cabinets Self Adhering sheet waterproofing Water Repellents Thermal Insulation Polyvinyl-Chloride (PVC) Roofing Sheet Metal Flashing and Trim Roof Accessories Penetration Firestopping Joint Firestopping Joint Sealants Acoustical Joint Sealants Hollow Metal Doors and Frames Access doors and frames Overhead Coiling doors Aluminum framed entrances and storefronts Aluminum Windows Door Hardware Glazing Moisture Vapor Emission Control Cement Plastering Gypsum Board Acoustical Panel Linear Metal Ceiling Resilient Base and Accessories Exterior Painting Interior Painting Panel Signage Toilet Accessories Fire Protection Cabinets Fire extinguishers Plumbing Electrical HVAC Assistive Listening Systems Clock Systems Fire Detection and Alarm System Site Clearing
ECV Community Resource & Classroom
CN-4722
GROSSMONT UNION HIGH SCHOOL DISTRICT
1035 E Madison Ave, 92021, CA, 92021
06-04-2026 at 02:00 PM
Bree
7605121188
NA
2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010
PROJECT DETAILS:
Bid Invite:
Number
26-018
Bids Due
Jun 4, 2026 at 2:00 PM PDT
Location
9600 Milden Street, El Cajon, CA 92020, United States of AmericaMap »
Currency
USD ($)
Job Walk
May 7, 2026 at 9:00 AM PDT
Expected Start
Jun 9, 2026
Expected Finish
Apr 9, 2027
Architect
Dahlin Group Architect
Description
DVBE: This bid is subject to Disabled Veteran Business Enterprise requirements. Minority, women, and disabled veteran contractors are encouraged to submit bids. District is required to have 3% percentage each year. Bidder must provide a DVBE prime or subcontractor at 3% or complete the Good Faith Efforts package. Construction Manager will place a DVBE ad. All paperwork is due at time of bid.
DIR REGISTRATION AND LABOR COMPLIANCE MONITORING
PREQUALIFICATION: Bidders are advised that all First tiered
subcontractors, even those under ½ of 1% and that are Mechanical, Electrical or Plumbing (“MEP”) must be listed in your bid package regardless of the percentage of work. All MEP first tier subcontractors that HOLD the stated licenses in PCC 20111.6 must be prequalified to work on this Project in accordance with the time requirements set forth above.